Power System Restoration: Blackstart Studies

机译:电力系统恢复:Blackstart研究

获取原文
获取原文并翻译 | 示例

摘要

Outages and blackouts do occur in the power systems operations. When outages involve part of the power system only, the process of restoration is generally straightforward. The remaining energized network is of great assistance to start the restoration process. However, in the case of blackouts, there is no adjacent network available to assist in the restoration. The restoration must be started from generating units capable of start themselves. Maintaining of load generation balance, energizing long transmission line and large bus transfer transformer and starting large motors are much more challenging with limited number of generators in service. It has been shown in several cases that lack of experience in the system restoration was one of the major reasons for the delayed availability of supply. Proper restoration studies and planning are required to ensure that power system restoration process could be smoothly executed within an acceptable timeframe.
机译:电力系统操作中确实会发生停电和停电。当停电仅涉及电力系统的一部分时,恢复过程通常很简单。剩余的通电网络为启动恢复过程提供了很大的帮助。但是,在停电的情况下,没有可用的相邻网络来协助恢复。必须从能够自行启动的发电机组开始恢复。在运行中,发电机数量有限,保持负载平衡,给长输电线和大型母线转换变压器通电以及启动大型电动机更具挑战性。在几种情况下,表明缺乏系统恢复经验是供应延迟的主要原因之一。需要进行适当的恢复研究和计划,以确保电力系统恢复过程可以在可接受的时间内顺利执行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号