首页> 外文会议>ICCD'89;IEEE international conference on computer design: VLSI in computers processors >IBM ES/9000 buried engineering change modeling for verificationMCM
【24h】

IBM ES/9000 buried engineering change modeling for verificationMCM

机译:IBM ES / 9000掩埋工程变更建模以进行验证MCM

获取原文

摘要

Buried engineering change (BEC) is a method of laying outengineering change (EC) wires within a multichip module (MCM) at theoriginal building time for later use. The authors discuss the modelingused to accurately predict delay, validate electrical integrity, and adda degree of flexibility to the wiring process. The purpose of developingthis BEC modeling methodology was to provide fast, accurate electricalverification and timing without using slower circuit modeling tools onindividual nets. By modeling classes of nets an equivalent model conceptwas developed that provided fast timing and verification of all nets.This modeling methodology centers around maintaining the originalmodeling structure for a net that is physically different whenengineering-changed. The IBM ES/9000 timing and verification toolsaccurately predicted net timing for BEC nets
机译:埋藏的工程变更(BEC)是一种布局方法 多芯片模块(MCM)中的工程变更(EC)线位于 原始建筑时间,以备后用。作者讨论了建模 用于准确预测延迟,验证电气完整性并添加 布线过程的灵活性。发展的目的 该BEC建模方法旨在提供快速,准确的电气 验证和时序,而无需使用较慢的电路建模工具 单个网。通过对网类建模,可以得出等效的模型概念 可以提供快速计时和验证所有网络的功能。 这种建模方法围绕维护原始模型 物理上不同的网络的建模结构 工程改变了。 IBM ES / 9000计时和验证工具 准确预测BEC网络的净时间

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号