【24h】

Design and Construction of a double-curved railway overpass and 3-track tubular arch

机译:双曲线铁路立交桥三轨管拱的设计与施工

获取原文
获取原文并翻译 | 示例

摘要

The new railway connection between Brussels Airport and the North of Belgium is being built inrnthe available space of the central reservation in between both driving directions of the E 19rnmotorway from Brussels to Antwerp. Among other important structures, this new line alsorncomprises two particular steel bridges. Both have been especially designed for the particularrngeometry of each crossing and according to the requirements for erection.rnThe overpass at Zemst allows the new railway to cross one driving direction of the motorway, asrnthe tracks change location from the central reservation towards the town of Mechelen. Hence, it isrncompletely located in a curved track alignment and constitutes a skew crossing. Due to theserncharacteristics, a continuous closed-section steel structure with 2 lateral edge members, including arncurved cross-section was designed. The central span is supported by 2 single bearings, thusrnrequiring all torsion to be resisted by the double bearings at both ends of the steel structure. Inrnaddition, the live loads being able to introduce lifting reactions at both ends, the hollow parts of thernstructure had to be ballasted by a concrete filling near both ends. The typical cross-section of thernbridge was mainly inspired by the torsion moments appearing in the steel girder. The superstructure,rnwelded from workshop prefabricated parts was welded near the building site and subsequently putrnin place by using movable hydraulic jacks.rnThe bridge across the Woluwe Lane carries 3 tracks, the two lateral ones being located above twornmain steel tube arches, whereas the central track is supported by a composite bridge deck, hangingrnbelow these arches. The connection between each bridge deck and the steel arches consists ofrnalmost vertical tube struts. During design, particular care has been given to the node detailing in thisrntubular bridge. In addition, the Woluwe Lane is an integral bridge, having no bearings or joints.rnDuring construction, lateral buckling of the arches had to be prevented by temporary lateralrnsupports. Erection of the tubular arches, particularly in assuring correct thrust forces in the mainrnarches, has required increased effort during construction.
机译:从布鲁塞尔到安特卫普的E 19rn高速公路的两个行驶方向之间,将在中央保留区的可用空间中建立布鲁塞尔机场和比利时北部之间的新铁路连接。除其他重要结构外,这条新生产线还包括两个特殊的钢桥。两者都是针对每个交叉口的特定几何形状并根据安装要求而专门设计的。Zemst的立交桥允许新铁路线穿越高速公路的一个行驶方向,因为铁轨的位置从中央保留地转向梅赫伦镇。因此,它不完全位于弯曲的轨道对准中,并构成了斜交。由于其特性,设计了一个连续的封闭截面钢结构,该结构具有2个侧向边缘构件,包括弯曲的横截面。中心跨度由2个单轴承支撑,因此需要在钢结构两端的双轴承抵抗所有扭转。另外,活荷载能够在两端引入起升反应,必须在两端附近用混凝土填充物来压实建筑结构的空心部分。桥梁的典型横截面主要是受到钢梁中出现的扭转力矩的启发。用车间预制部件焊接而成的上部结构焊接在建筑工地附近,然后使用可移动的液压千斤顶将其放置在适当的位置。横跨沃卢威巷的桥梁有3条轨道,两条横向轨道位于两个主要钢管拱上方,而中央轨道由拱门下方悬挂的复合桥面板支撑。每个桥面板和钢拱之间的连接都由几乎垂直的钢管撑杆组成。在设计过程中,已特别注意此管状桥中的节点细节。另外,Woluwe车道是一体的桥,没有轴承或接头。在施工期间,必须通过临时的侧向支撑来防止拱的侧向屈曲。管状拱的架设,特别是在确保主拱架中正确的推力方面,在建造过程中需要增加工作量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号