首页> 外文会议>IABSE symposium on tomorrow's megastructures >Structural Health Monitoring of Existing Bridges using Bridge Weigh-in-motion Measurements - Value of Information Analysis
【24h】

Structural Health Monitoring of Existing Bridges using Bridge Weigh-in-motion Measurements - Value of Information Analysis

机译:使用桥梁动态称量来测量既有桥梁的结构健康-信息分析的价值

获取原文
获取外文期刊封面目录资料

摘要

Implementation of Value of Information (Vol) analysis regarding Structural Health Monitoring (SHM) data and corresponding assessment results of Case Study bridge is presented in this paper. SHM data (traffic and structural), obtained with bridge weigh-in-motion (WIM) measurements, are implemented in the probabilistic assessment of load carrying capacity of a Case Study Bridge. In the first part of the paper, a short overview of SHM measurements and description of Case Study Bridge is presented, along with the assessment results. Link between SHM data and the corresponding structural performance is defined, and it is shown that application of WIM measurements in the assessment of existing road bridges can increase their reliability level and, therefore, extend the predicted service life of these bridges. In the second part of the paper, implementation of Vol analysis on Case Study Bridge is discussed and all the factors of interest are presented in the Vol flowchart. Furthermore, decision tree for Vol analysis is defined, along with correspondent outcomes, actions and resulting system states. Further steps and recommendations are discussed in the final part of the paper, including correlation factors, possible outcomes and, finally, discussion of resulting indicator as a benefit/cost ratio of Bridge WIM measurement implementation in assessment of existing bridges.
机译:本文介绍了有关结构健康监测(SHM)数据的信息价值(Vol)分析的实现以及案例研究桥梁的相应评估结果。通过桥梁动态称重(WIM)测量获得的SHM数据(交通和结构)用于对案例研究桥梁的承载能力进行概率评估。在本文的第一部分中,给出了SHM测量的简短概述以及Case Study Bridge的描述以及评估结果。定义了SHM数据和相应的结构性能之间的联系,结果表明,在现有道路桥梁评估中使用WIM测量可以提高其可靠性,从而延长了这些桥梁的预期使用寿命。在本文的第二部分中,讨论了在案例研究桥上实施Vol分析的方法,并在Vol流程图中介绍了所有感兴趣的因素。此外,还定义了用于Vol分析的决策树,以及相应的结果,操作和结果系统状态。本文的最后部分讨论了进一步的步骤和建议,包括相关因素,可能的结果,最后讨论了在现有桥梁评估中作为桥梁WIM测量实施的收益/成本比的结果指标。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号