Artificial tunnel on relocated Milan-Bologna railway in Modena

机译:在摩德纳搬迁的米兰-博洛尼亚铁路上的人工隧道

获取原文
获取原文并翻译 | 示例

摘要

In Modena, the high-speed Milan-Bologna railway system includes the relocation of about 10 km of the existing line, in a rural area at the limit of the town belt. An artificial tunnel has been designed to underpass the A1 Milan-Naples highway. The artificial tunnel is a box-shaped double track structure, 1950 m in length. A single-track tunnel is set along the main line tunnel, at a deeper level than the main tunnel. Halfway along the main tunnel , the lower tunnel underpasses the principal line tunnel at the depth of 22 m below ground level. The water table is at about 3m depth. A rainwater and oil drainage is designed, provided with a pumping system for lifting the storage liquid volume. The foundation soil is upgraded by jet-grouting treatment. Particular care was taken in the design of a compensation-grouting system for the double-track tunnel in order to eliminate the settlement effects resulting from the succeeding excavation phases for the single-track tunnel.
机译:在摩德纳,米兰-博洛尼亚高速铁路系统包括将现有线路移至大约10公里的地方,该地区位于城镇地带的边界。设计了一条人造隧道,以穿越A1米兰-那不勒斯高速公路。人工隧道是箱形的双线结构,长度为1950 m。沿干线隧道设置的单线隧道比主隧道更深。下部隧道沿着主隧道的中途在地面以下22 m处越过主线隧道。地下水位约3m。设计了雨水和排水装置,并设有用于提升储存液量的抽水系统。通过喷射注浆处理对基础土壤进行升级处理。在设计双线隧道补偿灌浆系统时要格外小心,以消除单线隧道后续开挖阶段所产生的沉降影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号