The foundation of a structure may be a concern due to historical occurrences, PFMA findingsrnand/or part of the rehabilitation plan for an aging dam. The need to obtain sufficient technicalrnfoundation information should be balanced with economic considerations.rnThis paper will discuss how foundation investigations more than offset the costs for the selectedrnimprovement. In addition to providing design information, the investigations identified criticalrnelements for construction mitigation measures. Some of the projects that will be discussed are:rn1. A powerhouse on a granular soil foundation that required lengthening the under seepagernpath by installing sheet piling. Because there was a concern that abnormal settlement ofrnthe structure might occur by installing the sheet piling, the foundation was furtherrnmonitored and underpinned with grout.rn2. An ambursen dam on a sandstone foundation that required the installation of post tensionrnanchors tied to the buttresses. There was a concern that there were probably granularrnlenses in the sandstone that might affect the anchor design and could result in artesianrnconditions during the anchor installations. Thus, the mechanisms and cost to dewaterrnduring construction were very important.rn3. The major replacement of generation equipment in a powerhouse that was located on arnsandstone foundation. The project required significant dewatering and concrete removals,rnwhich affected stability. The potential uplift pressures needed to be quantified andrnmitigation plans developed for construction dewatering.rnFor these projects, instrumentation was left in place as part of the Surveillance Monitoring Plan.rnIt provides ongoing information on potential foundation problems that could impact the projectrnstability.
机译:由于历史的发生,PFMA的发现和/或老化大坝的修复计划的一部分,结构的基础可能会引起关注。获得充分的技术基础信息的需求应与经济考虑相平衡。本文将讨论基础研究如何充分抵消所选改进的成本。除了提供设计信息外,调查还确定了缓解施工措施的关键要素。将要讨论的一些项目是:rn1。粒状土壤基础上的发电站,需要通过安装板桩来延长下渗路径。由于担心通过安装板桩可能会导致结构异常沉降,因此对基础进行了进一步监控并用灌浆进行支撑。砂岩地基上的安布森水坝,需要安装与支柱连接的后张紧器。令人担忧的是,砂岩中可能存在颗粒状的透镜,可能会影响锚固件的设计,并可能在锚固件安装期间导致自流条件。因此,施工过程中的脱水机理和费用非常重要。3。位于arnsandstone基础上的发电站中的发电设备的主要更换。该项目需要大量的脱水和混凝土清除,这影响了稳定性。需要对潜在的抬升压力进行量化,并制定用于建筑脱水的缓解计划。对于这些项目,将仪器留在现场,作为监视监测计划的一部分。它提供有关可能影响项目稳定性的潜在基础问题的持续信息。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号