CONSTRUCTION TECHNOLOGY AND QUALITY CONTROL OFSHAPAI RCC ARCH DAM

机译:沙排碾压混凝土拱坝施工技术与质量控制

获取原文
获取原文并翻译 | 示例

摘要

Shapai Dam used to be the world’s highest full-section RCC arch dam, with a height of 130 m,rnand the basis of “ Study of RCC High Dam Construction Technology”, a state task-force research projectsrnduring the “9th Five-year Plan Period”. The dam is raised continuously by full-face thin layers, with RCCrnconcrete mixed in new-type forced mixers with a mixing time of 12s only. The average C3A content ofrncement incorporated into the dam is 4.7%, and C4AF content 18.8%. The high-iron and low-aluminumrnformula produces cement of low fragility and high crack resistance, and in turn RCC of high tensilernstrength and low elasticity modulus, with an average ultimate tension of 1.36x10-4, modulus ofrncompression 16.65GPa, and modulus of elasticity in tension 20.12GPa. According to the equation based onrnthe findings of state task-force researches during the “9th Five-year Plan Period”, as retrieved from outletrntest results, Grade 2 RCC used to the project has a 90d crack resistance of 1.08, and Grade 3 has 1.06.rnAccording to calculations of core test results, Grade 3 has a crack resistance of 1.65, while ordinaryrnconcrete has a value of 0.4-0.6, I.e. a difference of 100% approximately. Thus, this dam has never shownrnany crack after having experienced cold winters and hot summer in despite of poor insulation andrnprotection measures (due to financial reasons), which is undoubtedly related to the crack resistance of RCCrnper se. On the other hand, a lot of techniques are employed during construction, such as repeated groutingrnof reduced joint, vertical transport via vacuum chute, wider use of modified concrete, and application ofrnloaded/unloaded consolidation (contact) grouting. Due to the particularity of weather conditions and therncomplexity of raw materials, a project-specific quality control process is deliberated in the process ofrnconstruction. The RCC cores taken out of the completed embankment is 13.2 m long to the maximum,rnsmooth in surface, even in aggregate distribution and good in layer contact. Core test results indicate thatrnall performance indexes meet the design requirements, suggesting excellent quality of construction.
机译:沙牌水坝曾是世界上最高的全断面碾压混凝土拱坝,高130 m,是“九五”期间国家专责小组研究项目“碾压混凝土高坝建设技术研究”的基础。期”。大坝由全脸薄层连续抬高,RCCrn混凝土在新型强制混合机中混合,混合时间仅为12s。掺入大坝的平均C3A含量为4.7%,C4AF含量为18.8%。高铁低铝配方可生产出低脆性和高抗裂性的水泥,进而产生高抗拉强度和低弹性模量的RCC,平均极限抗拉强度为1.36x10-4,平均压缩模量为16.65GPa,且弹性模量张力为20.12GPa。根据基于“第九个五年计划”期间国家工作队研究结果的方程,从出口测试结果中得出,用于该项目的2级RCC具有908的抗裂性1.08,而3级具有1.06 .rn根据岩心测试结果的计算,等级3的抗裂性为1.65,而普通混凝土的抗裂性值为0.4-0.6,即相差约100%。因此,尽管隔热和保护措施不佳(由于经济原因),该大坝在经历了寒冷的冬季和炎热的夏季后从未显示出任何裂缝,这无疑与RCCrnper的抗裂性有关。另一方面,在施工过程中采用了许多技术,例如,重复灌浆,减少缝隙,通过真空斜槽进行垂直输送,改性混凝土的广泛使用以及有/无载固结(接触)灌浆的应用。由于天气条件的特殊性和原材料的复杂性,在施工过程中会考虑特定项目的质量控制过程。从完整路堤中取出的RCC岩心最大长度为13.2 m,表面均匀,即使骨料分布均匀,层间接触也很好。核心测试结果表明,所有性能指标均符合设计要求,表明施工质量优异。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号