The State Key Laboratory of Hydraulics and Mountain River Engineering, Sichuan University, Chengdu 610065, China;
rnThe State Key Laboratory of Hydraulics and Mountain River Engineering, Sichuan University, Chengdu 610065, China;
The State Key Laboratory of Hydraulics and Mountain River Engineering, Sichuan University, Chengdu 610065, China;
rnThe State Key Laboratory of Hydraulics and Mountain River Engineering, Sichuan University, Chengdu 610065, China;
rnThe State Key Laboratory of Hydraulics and Mountain River Engineering, Sichuan University, Chengdu 610065, China;
high dam; total dissolved gas; supersaturation; field observation;
机译:在总溶解气体过度饱和度下濒危和地方鱼类致死性特征的野外观察
机译:利用遥测和水力模型估算成年奇诺克鲑鱼暴露于溶解的水汽中的超饱和气体下游
机译:高坝大喷头总溶解气体过饱和度模型
机译:高坝总溶解气体过饱和的现场观察
机译:溢洪道下游总溶解气体的计算模型。
机译:总溶解气体过饱和度对Big鱼存活的影响
机译:总溶解气过饱和对草鲤鱼耐受性的影响(Ctenopharyngodon Idellus)
机译:纳瓦霍大坝辅助出口工程和空心喷射阀旁路改造的水力模型研究,以减少溶解气体过饱和度,