THE MANAGEMENT OF LONDON'S ROYAL OPERA HOUSE, CONSIDERED AS A COMPLEX ADAPTIVE SYSTEM

机译:伦敦皇家歌剧院的管理,被视为一个复杂的适应系统

获取原文
获取原文并翻译 | 示例

摘要

London's Royal Opera House, Covent Garden, is the only internationally ranking opera house in the UK. In the late 1990s, it encountered some very high profile management problems. Insolvency and potential closure were averted at the eleventh hour. The principal cause of the most recent problems has been the scheme to redevelop the ROH to provide a restored historic theatre with extra space and leading edge technology appropriate to the twenty-first century.rnThis paper relates the events preceding and during the redevelopment project, and analyses the problems in terms of the objectives and influence of the principal actors. The subject is considered as a complex interactive system, and the nature of such systems is discussed. The incompatible objectives of some of the major actors introduce additional complexity.rnThe paper concludes that some elements of the problem situation could be attributed to the characteristics of the complex adaptive system of which the ROH is a part. However, a major contributor was a combination of managerial error and fundamental inconsistencies within the greater system.
机译:伦敦的皇家歌剧院,考文特花园,是英国唯一的国际排名歌剧院。在1990年代后期,它遇到了一些非常引人注目的管理问题。在第十一小时避免了破产和潜在的关闭。造成最新问题的主要原因是重建ROH的计划,以提供经过修复的历史剧场,并提供适合21世纪的额外空间和领先的技术。rn本文涉及重建项目之前和重建期间的事件,以及根据主要参与者的目标和影响分析问题。该主题被视为复杂的交互式系统,并讨论了此类系统的性质。一些主要参与者的不兼容目标引入了额外的复杂性。本文得出结论,问题情况的某些要素可能归因于ROH参与的复杂自适应系统的特性。但是,一个主要的贡献者是更大系统中管理错误和基本矛盾的结合。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号