首页> 外文会议>Groundwater-Present Status and Future Task >STABILITY ANALYSIS OF RESERVOIR LANDSLIDE UNDERRAINFALL AND RESERVOIR WATERLEVEL DRAWDOWN CONDITIONS
【24h】

STABILITY ANALYSIS OF RESERVOIR LANDSLIDE UNDERRAINFALL AND RESERVOIR WATERLEVEL DRAWDOWN CONDITIONS

机译:水库滑坡降洪及水库水位降落条件的稳定性分析

获取原文
获取原文并翻译 | 示例

摘要

After the Three Gorges reservoir is built, the reservoir water level will fluctuate between 175m and 145m because ofrnthe need of flood prevention and power generation. The periodical rise and descent of water level in high frequency and the influencernof heavy rainfall will change the intrinsic geological circumstance and conditions greatly which may result in the instability ofrnreservoir banks and slopes. Take a landslide locating in Zhongba reservoir bank as an example, according to the Three Gorgesrnreservoir water level operation options, considering the influence of the practical rainfall intensity-duration course in the ThreernGorges reservoir region, transient seepage influenced by the combination of the descending of reservoir water level from 175m torn145m and rainfall infiltration is calculated using the nonsteady fluid flow finite difference method ( FDM ) by which the changes ofrnrainfall and reservoir level can be considered day by day. The transient nodal point head (infiltration lines) are then used for limitrnequilibrium analysis of landslide. The change laws of landslide stability are discussed under different calculation conditions. Thernresults of stability analysis show that when the reservoir water level drawdown only, the coefficient of safety declines firstly, and thenrnincreases. There is a minimum safety coefficient when the reservoir level is at about 160m to 163m. In addition, when influenced byrnthe combination of rainfall and reservoir water level drawdown, the safety coefficient of landslide will decrease all the time till thernlandslide revives, the critical reservoir water level is also at between 160m to 163m , which will need more attention in the treatmentrnproject of landslide in Three Gorges reservoir area.
机译:三峡水库建成后,由于需要防洪和发电,水库水位将在175m和145m之间波动。高频率水位的周期性上升和下降以及暴雨的影响将极大地改变内在的地质情况和条件,从而可能导致库岸和边坡的不稳定。以中坝水库库岸滑坡为例,根据三峡库区水位运行方案,考虑三峡库区实际降雨强度-持续时间过程的影响,水库降级组合对瞬时渗流的影响175m至145m的水位和降雨入渗量是采用非恒定流有限差分法(FDM)计算的,该方法可以日复一日地考虑降雨和水库水位的变化。然后将瞬态节点点头(渗透线)用于滑坡极限平衡分析。探讨了不同计算条件下滑坡稳定性的变化规律。稳定性分析结果表明,仅在水库水位下降时,安全系数先下降,然后上升。当水库水位在约160m至163m时,存在最小安全系数。此外,在降雨和水库水位下降的共同作用下,滑坡的安全系数会一直下降,直到滑坡恢复活跃为止,水库的临界水位也在160m到163m之间,在处理工程中需要更多的注意。三峡库区滑坡灾害

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号