INTEGRATING WIND AND DEMAND-SIDE MANAGEMENT INTOTRANSMISSION PLANNING:THE ROCKY MOUNTAIN AREA TRANSMISSION STUDY

机译:将风电与需求侧管理集成到输电计划中:洛矶山脉地区的输电研究

获取原文
获取原文并翻译 | 示例

摘要

Plans to expand the western grid are now underway. Bringing power from low-costrnremote resources-including wind-to load centers could reduce costs for all consumers.rnBut many paths appear to be already congested. Locational marginal price-basedrnmodeling is designed to identify the most cost-effective paths to be upgraded. Thernranking of such paths is intended as the start of a process of political and regulatoryrnapprovals that are expected to result in the eventual construction of new and upgradedrnlines. This paper reviews the necessary data and analytical tasks to accurately representrnwind in such modeling, and addresses some policy and regulatory issues that can helprnwith wind integration into the grid. Providing wind fair access to the grid also (and morernimmediately) depends on tariff and regulatory changes. Expansion of the RockyrnMountain Area Transmission Study (RMATS) study scope to address operational issuesrnsupports the development of transmission solutions that enable wind to connect andrndeliver power in the next few years-much sooner than upgrades can be completed.rnTaken together, the economic modeling and tariff investigation of the RMATS studyrnprovide an unprecedented opportunity for utility planners, regulators, and state officialsrnto consider the integration of gigawatt-scale additions of wind power into the WesternrnInterconnection. In doing so, it sets important precedents for treating wind inrntransmission studies in other regions.
机译:扩大西部电网的计划目前正在进行中。从低成本的远程资源(包括风力发电中心)供电可以降低所有消费者的成本。但是,许多途径似乎已经很拥挤。基于位置边际价格的模型旨在确定要升级的最具成本效益的路径。这些路径的混乱旨在作为政治和法规批准程序的开始,预计该过程最终将导致新线路和升级线路的建设。本文回顾了必要的数据和分析任务,以准确地表示这种建模中的风,并解决了一些有助于将风集成到电网中的政策和法规问题。提供(并立即)进入电网的风电场还取决于电价和监管变化。扩大落基山地区传输研究(RMATS)研究范围以解决运营问题rn支持开发传输解决方案,使风能在未来几年内连接并交付电力-比升级完成要早得多。对RMATS研究的调查为公用事业计划者,监管者和州官员提供了前所未有的机会,可以考虑将千兆瓦级的风力发电增加到WesternrnInterconnection中。这样,它为治疗其他地区的风向传输研究提供了重要的先例。

著录项

  • 来源
  • 会议地点 Chicago IL(US)
  • 作者单位

    West Wind Wires 511 Brookside Dr.rnEugene, OR 97405 hamilton.roger@comcast.net;

    American Wind Energy Association 4950 Sanford Circle WestrnEnglewood, CO. 80110-5127 rllehr@msn.com;

    Center for Energy Efficiency and Renewable Technologiesrn3804 Pacific Coast Highway Ventura, CA 93001rnolsen@avenuecable.com;

    Western Resource Advocatesrn2260 Baseline #200 Boulder, CO. 80302rnjnielsen@westernresources.org;

    National Renewable Energy Laboratory National Wind Technology Centerrn1617 Cole Blvd. Golden, CO 80401 Tom_Acker@nrel.gov;

    National Renewable Energy Laboratory National Wind Technology Centerrn1617 Cole Blvd. Golden, CO 80401 Michael_Milligan@nrel.gov;

    Southwest Energy Efficiency Project (SWEEP) 2260 Baseline Rd. #212 Boulder, CO 80302 hgeller@swenergy.org;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号