首页> 外文会议>Global Floating Production Systems 2005 >North Sea - Challenges Opportunities
【24h】

North Sea - Challenges Opportunities

机译:北海-挑战与机遇

获取原文
获取原文并翻译 | 示例

摘要

1. Reducing Time to First Oil is Feasible: 1.1 through redeployment of an existing FPF or use of new concepts (e.g. SSP); 1.2 no options, including subsea tieback, currently achieve breakeven at P90; 1.3 future success is largely dependent the level of risk that is acceptable relative to the potential upside. 2. Key Questions: 2.1 how much of the upside are field owners prepared to give up to progress the development by reducing risk to 'acceptable' levels? 2.2 how much of the un-risked lease rate are vessel owners willing to sacrifice in exchange for a share of the potential upside?
机译:1.减少首次使用石油的时间是可行的:1.1通过重新部署现有的FPF或使用新概念(例如SSP); 1.2目前没有任何选择(包括海底抢断)在P90达到收支平衡; 1.3未来的成功很大程度上取决于相对于潜在上涨而言可接受的风险水平。 2.关键问题:2.1现场所有者准备通过降低风险到“可接受的”水平放弃多少发展空间? 2.2船东愿意牺牲多少无风险租赁率以换取一部分潜在的上涨潜力?

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号