首页> 外文会议>Geotechnical Special Publication no.144; Multidisciplinary Conference; 20050924-28; San Antonio,TX(US) >INTEGRATED GEOPHYSICAL SURVEYS APPLIED TO KARSTIC STUDIES OVER TRANSMISSION LINES IN SAN ANTONIO, TEXAS
【24h】

INTEGRATED GEOPHYSICAL SURVEYS APPLIED TO KARSTIC STUDIES OVER TRANSMISSION LINES IN SAN ANTONIO, TEXAS

机译:德克萨斯州圣安东尼奥输电线路岩溶研究中的综合地球物理调查

获取原文
获取原文并翻译 | 示例

摘要

CPS Energy™ of San Antonio constructed three electric transmission lines (Fair Oaks Ranch Area, Stone Gate-Hill Country and Stone Gate to Green Mountain) in the last three years across the boundaries of the Edwards Limestone Aquifer in San Antonio, Texas. The purpose of geophysical studies (2-D resistivity imaging, ground penetrating radar and natural potential) was to determine voids, caves or any other karstic features beneath the power pole locations. Results of 2-D resistivity imaging, ground penetrating radar (GPR) and natural potential (NP) surveys helped to determine locations and depth of voids in the near surface as deep as 40 feet. In this way, we relocated the pole locations, if necessary, to reduce the potential for the construction to impact threatened or endangered species and to locate more solid limestone to seat the pole footings. One hundred fifty-four (154) pole locations were studied along these three transmission lines. During the drilling of these pole locations, which were based on the geophysical data, three significant ( > 5 feet in diameter) and two insignificant ( < 5 feet in diameter) voids were encountered. If a cave or void was encountered, an engineering evaluation was conducted to determine if the pole installation can proceed as planned, or if the pole installation design needs to be changed, or if the hole should be abandoned and a new hole drilled. Thus, the purpose of this paper is to discuss the geophysical data obtained over some of the drilled pole locations with significant voids and why the geophysical surveys did not detect them. In addition, we discuss the geophysical signature of a known karstic feature such as Tick''n Delight Cave in the vicinity of these pole locations.
机译:在过去的三年中,圣安东尼奥的CPS Energy™在德克萨斯州圣安东尼奥市的爱德华兹石灰石含水层的边界建造了三条电力传输线(公平橡树牧场区,石门山丘乡村和通向绿山的石门)。地球物理研究(二维电阻率成像,探地雷达和自然电势)的目的是确定电线杆位置下方的空隙,洞穴或任何其他岩溶特征。二维电阻率成像,探地雷达(GPR)和自然电势(NP)调查的结果有助于确定深达40英尺的近地表中空洞的位置和深度。这样,我们在必要时重新布置了极点位置,以减少施工对受威胁或濒危物种造成冲击的可能性,并定位更多的固态石灰石来安置极点。沿着这三条传输线研究了一百五十四(154)个极点位置。在根据地球物理数据钻探这些极点位置的过程中,遇到了三个明显的(直径大于5英尺)和两个很小的(直径小于5英尺)空隙。如果遇到洞穴或空隙,则进行工程评估,以确定杆安装是否可以按计划进行,或者是否需要更改杆安装设计,或者是否应该放弃该孔并钻一个新的孔。因此,本文的目的是讨论在某些带有明显空隙的钻杆位置获得的地球物理数据,以及为什么地球物理调查没有检测到它们。此外,我们讨论了这些极点附近的已知岩溶特征(如Tick''n Delight Cave)的地球物理特征。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号