Facing with the combined challenge of aging sewer infrastructure and rapid population growth,rnthe Abu Dhabi Sewerage Services Company (ADSSC) embarked on a bold approach to build an enhancedrnsewer infrastructure with a deep gravity sewer tunnel at the center. The primary lining of the new 41 km-longrndeep sewer tunnel has been completed by tunnel boring machines (TBM). The concrete segmental lining has anrninternal diameter varying from 4m to 5.5m internal diameter, and is located at depths of 20m to 80m below thernground surface. This paper attempts to quantify the results of observations made on groundwater infiltrationsrnand response to repair works experienced at different stages in construction of concrete segmental lining forrndeep sewer tunnels. The observations presented below have been based on the actual data obtained from a totalrnof 10,872 rings installed in three TBM drives in Contract T-02 of Abu Dhabi’s Strategic Tunnel EnhancementrnProgramme (STEP).
机译:面对下水道基础设施老化和人口快速增长的双重挑战,阿布扎比下水道服务公司(ADSSC)采取了大胆的方法,以在中心处设有深重力下水道的方式建设了增强的下水道基础设施。新的41公里长的深层污水管道的主要衬砌已由隧道掘进机(TBM)完成。混凝土分段衬砌的内径在4m到5.5m内径之间,位于地下地面以下20m到80m的深度。本文试图量化关于地下渗水隧道混凝土分段衬砌施工中不同阶段经历的地下水渗入和对维修工作的响应的观测结果。下面的观察结果是基于从阿布扎比战略隧道增强计划(STEP)的T-02合同的三个TBM驱动器中安装的总共10,872个环的实际数据得出的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号