首页> 外文会议>Geotechnical aspects of underground construction in soft ground >Temporary support of excavation walls-case study
【24h】

Temporary support of excavation walls-case study

机译:开挖墙的临时支撑-案例研究

获取原文
获取原文并翻译 | 示例

摘要

Various methods of temporary stabilization of soil excavations are used to support the excavationsrnwall. Soldier pile system and bored concrete piles are very versatile excavation retaining system for deeprnexcavations in urban areas surrounded by major structures and infrastructures provided that limiting lateralrndisplacements are not exceeded. In this study we have surveyed performance of various support systems thatrnapplied in excavations walls of entrance ramp of the Niayesh road tunnel project. These walls were supportedrnby soldier pile system reinforced by soil nails and Bored Pile system reinforced by anchors and struts elements.rnThe lateral deformations of walls were monitored parallel to the excavation progress from several target pointrnon the surface of the wall. Some Finite Element models were developed to analyze performance of the walls.rnThe analyses results were compared with monitored lateral deformations and performance and stability of eachrnsystem were compared with other systems.
机译:使用各种临时稳定土方开挖的方法来支撑土方开挖墙。士兵桩系统和钻孔混凝土桩是非常多才多艺的挖掘保持系统,用于在主要结构和基础设施所包围的城市地区进行深基坑开挖,前提是不超过有限的横向位移。在这项研究中,我们调查了在Niayesh公路隧道项目入口坡道的开挖墙中应用的各种支撑系统的性能。这些墙由用土钉加固的士兵桩系统和由锚固和支杆构件加固的钻孔桩系统支撑。墙的横向变形与从墙体的多个目标指向的开挖进度平行进行监测。开发了一些有限元模型来分析墙的性能。将分析结果与监测的横向变形进行比较,并将每个系统的性能和稳定性与其他系统进行比较。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号