首页> 外文会议>Geosynthetics in Civil and Environmental Engineering >IMPROVEMENT OF ARCH ACTION AT CLAY CORE-WALL OF HIGH ROCKFILL DAM BY UNITED SEEPAGE CONCROL WITH GEOMEMBRANE
【24h】

IMPROVEMENT OF ARCH ACTION AT CLAY CORE-WALL OF HIGH ROCKFILL DAM BY UNITED SEEPAGE CONCROL WITH GEOMEMBRANE

机译:土工膜联合渗流控制改善高堆石坝黏土墙拱的作用。

获取原文
获取原文并翻译 | 示例

摘要

In this paper, the stress, strain, and seepage of a high rock-fill dam with clay core on the sand-gravel foundation is numerically simulated with FLAC3D software. United seepage control with Geomembrane and disfigurement clay core in high rock-fill dam is a new design idea. The study result shows that the united seepage control measure not only can greatly lower the phreatic water surface in clay core but also can weaken the arch-action effectively which may result in horizontal cracks in clay core. In addition, the adoption of this kind of united seepage control measure can avoid the phenomenon that the maximum principal stress is less than pore pressure at the same elevation and improve the safety of clay core in mechanical and hydraulic ways.
机译:本文利用FLAC3D软件对砂砾石地基上具有粘土芯的高堆石坝的应力,应变和渗流进行了数值模拟。在高堆石坝中采用土工膜和毁容粘土芯进行联合防渗是一种新的设计思想。研究结果表明,采取统一的防渗措施,不仅可以大大降低黏土心中的潜水水面,而且可以有效地削弱拱作用,从而导致黏土心中出现水平裂缝。另外,采用这种统一的防渗措施可以避免在相同高度下最大主应力小于孔隙压力的现象,并以机械和水力的方式提高了粘土芯的安全性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号