首页> 外文会议>GeoShanghai International Conference; 20060606-08; Shanghai(CN) >Vibration, Energy, and Pile Embedment Relationships During Driven Pile Installation
【24h】

Vibration, Energy, and Pile Embedment Relationships During Driven Pile Installation

机译:打桩过程中的振动,能量和桩埋入关系

获取原文
获取原文并翻译 | 示例

摘要

Installation of driven piles generate ground vibrations as the pile shears and displaces soil during its penetration. Typically, the magnitudes of ground vibrations from driven pile installations are greater as the pile penetrates stiff/dense soils than in soft/loose soils. For thirteen piles driven at six project sites in the Charleston, South Carolina area, ground vibration and dynamic pile measurements taken during pile installation were compared to available insitu soil testing parameters. The results showed the following: (ⅰ) peak ground vibrations generally occurred during pile installation through the dense sands located above the Cooper Marl formation, (ⅱ) the peak vibrations were typically observed along the longitudinal and/or vertical axes, and (ⅲ) the average peak vector sum vibrations within the Cooper Marl were 68% of the average peak vector sum magnitude within the dense sands.
机译:当打桩过程中,打桩过程中剪切并置换土壤时,打入桩的安装会产生地面振动。通常,当桩穿透坚硬/致密的土壤时,与在柔软/松散的土壤中相比,从动桩安装产生的地面振动的强度更大。对于在南卡罗来纳州查尔斯顿地区六个项目现场打桩的13个桩,将桩安装过程中的地面振动和动态桩测量与可用的现场土壤测试参数进行了比较。结果表明:(ⅰ)通常在通过Cooper Marl地层上方的致密砂子进行桩身安装时,出现地面振动峰值;(ⅱ)通常沿纵向和/或垂直轴观察到峰值振动,以及(ⅲ) Cooper Marl内的平均峰值矢量和振动为致密砂土内平均峰值矢量和大小的68%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号