首页> 外文会议>Fiftieth Annual Southwestern Petroleum Short Course; Apr 16-17, 2003; Lubbock, Texas >USING DYNAMIC, INTERNET-ENABLED RESERVOIR SIMULATION TECHNOLOGY TO ENHANCE ONGOING RESERVOIR MANAGEMENT AND FIELD DEVELOPMENT
【24h】

USING DYNAMIC, INTERNET-ENABLED RESERVOIR SIMULATION TECHNOLOGY TO ENHANCE ONGOING RESERVOIR MANAGEMENT AND FIELD DEVELOPMENT

机译:使用动态的,启用Internet的储层模拟技术来增强正在进行的储层管理和油田开发

获取原文
获取原文并翻译 | 示例

摘要

By coupling the communications power of the internet with the latest in reservoir simulation technology, it is now feasible to direct oil and gas field development in near real-time, using a continuously updated computer model that matches and reflects the actual rates and pressure data observed in the field. While quarterly or monthly updates are probably sufficient in most cases, operators have the option of updating the model weekly or even daily in order to meet the needs of each situation. This ground breaking approach can remove much of the risk from evaluating well completions, optimizing the location of offset and infill wells, predicting reservoir pressures, flow rates, reservoir drainage patterns, identifying the most effective completion methods, well spacing patterns and many other field management decisions. This paper illustrates how this kind of dynamic reservoir simulation can be implemented, even for small, remote production locations, and it cites examples of where this has already been tried, the results that were obtained and describes the experience of those who have actually implemented this approach. The capability now exists for operators, regardless of size or location, to model every new development well (prior to drilling), identify the most cost-efficient reservoir drainage plan and adjust that plan in an ongoing manner based on actual field/well behavior.
机译:通过将互联网的通信能力与最新的油藏模拟技术相结合,使用连续更新的计算机模型来匹配和反映观测到的实际速率和压力数据,现在几乎可以实时指导油气田开发在该领域。尽管在大多数情况下,季度或每月更新可能就足够了,但操作员可以选择每周甚至每天更新一次模型,以满足每种情况的需求。这种开创性的方法可以消除以下风险:评估完井,优化偏移井和填充井的位置,预测储层压力,流速,储层排水模式,确定最有效的完井方法,井距模式和许多其他现场管理决定。本文说明了即使在较小的偏远生产地点也可以实施这种动态油藏模拟,并列举了已在何处进行了尝试,获得的结果的示例,并描述了实际实施此方法的人员的经验。方法。现在,无论大小或位置如何,操作员都可以对每个新开发井进行建模(在钻探之前),确定最具成本效益的储层排水计划并根据实际的田间/井井动态不断调整该计划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号