首页> 外文会议>European Symposium of the Working Party on Computer Aided Process Engineering(ESCAPE-15) pt.B; 20050529-0601; Barcelona(ES) >A Continuous-Time Formulation for Scheduling Multistage Multi-product Batch Plants with Non-identical Parallel Units
【24h】

A Continuous-Time Formulation for Scheduling Multistage Multi-product Batch Plants with Non-identical Parallel Units

机译:具有不同并联单元的多阶段多产品批生产工厂调度的连续时间公式

获取原文
获取原文并翻译 | 示例

摘要

Multi-stage multi-product batch plants with non-identical parallel units are quite common in the batch chemical industry. Scheduling production in these plants optimally is a complex task that has received limited attention in the literature. In this work, we propose a new continuous time-representation using asynchronous slots and report a mixed integer linear programming (MILP) formulation for the short-term scheduling of such plants. Using several examples, we show that our formulation is simpler, tighter, and performs better than previous formulations.
机译:具有不同并联单元的多级多产品批处理工厂在批处理化学工业中非常普遍。在这些工厂中最佳地安排生产是一项复杂的任务,在文献中受到的关注很少。在这项工作中,我们提出了一种使用异步时隙的新的连续时间表示方法,并报告了混合整数线性规划(MILP)公式,用于此类工厂的短期调度。通过几个示例,我们证明了我们的配方比以前的配方更简单,更紧密并且性能更好。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号