Engineering the integration of a steam turbine into an existing process air compressor train

机译:工程将蒸汽轮机集成到现有的过程空气压缩机组中

获取原文
获取原文并翻译 | 示例

摘要

A major project to increase the throughput and improve variable cost on a large polyester intermediates plant identified the opportunity for heat recovery which would generate surplus extra low pressure steam. This led to an investigation into the feasibility of installing a steam turbine on the plant. A conventional turbo-generator did not meet the project payback requirements. An alternative solution of integrating a turbine into the existing 24MW air compressor train was developed. This paper describes the engineering solutions to the many issues encountered during the whole project from concept through to execution. The challenge was to produce a layout that met the space constraints and could be constructed within the shutdown timescale. Meeting these requirements led to further challenges with rotor design to avoid both lateral and torsional critical speed problems and with overspeed protection of the rotor.
机译:大型聚酯中间体工厂的一项旨在提高生产量并改善可变成本的重大项目,确定了进行热回收的机会,这将产生多余的超低压蒸汽。这导致对在工厂安装蒸汽轮机的可行性进行调查。传统的涡轮发电机无法满足项目的投资回报要求。开发了将涡轮机集成到现有的24MW空气压缩机组中的替代解决方案。本文描述了从概念到执行的整个项目中遇到的许多问题的工程解决方案。面临的挑战是如何制造一种满足空间限制的布局,并且可以在停机时间内进行构建。满足这些要求导致转子设计面临更多挑战,以避免横向和扭转临界转速问题以及转子的超速保护。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号