【24h】

Troubleshooting of C2 splitter columns: two cases

机译:C2分离器列的故障排除:两种情况

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

The final step in ethylene purification during its commercial production is usually the separation of ethylene from ethane by fractionation, in a C2 splitter column. This paper outlines the operating problems that were faced in C2 splitter columns in two different Ethylene Plants, and how troubleshooting was carried out successfully. Additionally, a valuable insight was obtained on using AspenPlus effectively for such systems, which was further consolidated during test runs, making it a powerful tool for effective troubleshooting.
机译:商业生产中乙烯纯化的最后步骤通常是在C2分离塔中通过分馏从乙烯中分离乙烯。本文概述了两个不同乙烯工厂的C2分离塔面临的操作问题,以及如何成功进行故障排除。此外,在有效地将AspenPlus用于此类系统方面获得了宝贵的见解,在测试运行过程中得到了进一步的巩固,使其成为有效进行故障排除的强大工具。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号