首页> 外文会议>ESA SP-611; Dragon Symposium on Mid-Term Results; 20050627-0701; Santorini(GR) >DEM RECONSTRUCTION USING SHORT BASELINE ERS-1/2 TANDEM DATA AND SRTM DEM
【24h】

DEM RECONSTRUCTION USING SHORT BASELINE ERS-1/2 TANDEM DATA AND SRTM DEM

机译:使用短基线ERS-1 / 2串联数据和SRTM DEM重建DEM

获取原文
获取原文并翻译 | 示例

摘要

Considering the geometry formula of synthetic aperture radar interferometry (InSAR), interferogram with short baseline is rarely used for Digital Elevation Model (DEM) generation. However, in some areas, high fringe frequency and geometry decorrelation caused by long baseline make phase unwrapping difficult. A new approach is presented in this paper to produce DEM in mountainous areas with a steep slope using interferogram with short baseline. Instead of ground control points (GCPs), an external DEM such as that from Shuttle Radar Topography Mission (SRTM) is used in this approach. Facilitated by SRTM DEM, systematic phase errors and unreliable height points are removed respectively. The application of this approach to an ERS Tandem interferogram with baseline of 16 m over the Three Gorges region in China shows that the resultant DEM agrees to a 1:50,000 DEM from National Center for Geomatics of China within about 50m.
机译:考虑到合成孔径雷达干涉仪(InSAR)的几何公式​​,基线较短的干涉图很少用于数字高程模型(DEM)的生成。但是,在某些区域中,由较长的基线引起的高条纹频率和几何解相关使相位展开变得困难。本文提出了一种使用基线短的干涉图在陡坡山区生产DEM的新方法。在这种方法中,代替了地面控制点(GCP),而是使用了来自航天飞机雷达地形任务(SRTM)的外部DEM。在SRTM DEM的帮助下,分别消除了系统的相位误差和不可靠的高度点。该方法在中国三峡地区基线为16 m的ERS串联干涉图中的应用表明,所得的DEM与中国国家测绘中心在大约50m内的1:50,000 DEM相符。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号