首页> 外文会议>ER 2001 Workshops on HUMACS, DASWIS, ECOMO, and DAMA, Nov 27-30, 2001, Yokohama, Japan >A Study on Human-Centric Real-Time Scheduling for PWB Assembly Line
【24h】

A Study on Human-Centric Real-Time Scheduling for PWB Assembly Line

机译:PWB流水线以人为中心的实时调度研究

获取原文
获取原文并翻译 | 示例

摘要

Aiming at promoting both a mass customized production, and higher motivations of human operators, we have conducted an analysis, and a simulation on the Printed Wireling Board (PWB) assembly line. Furthermore, we have developed a simulation model to realize our aim of the research in actual manufacturing fields. Our simulation models contains "action-owners," such as human operators, machines, robots, and so forth, and also "unit-processes" composed of one or more actions and independent from any specific action-owners. A real-time scheduling system employed such kind of models can visualize dynamic exchanges of action-owners between processes aligned with situation changes, and consequently contribute to realize a mass customized production in a human-machine cooperative manufacturing environment.
机译:为了促进大规模定制生产和提高操作员的积极性,我们在印刷线路板(PWB)装配线上进行了分析和模拟。此外,我们已经开发了一个仿真模型来实现我们在实际制造领域中的研究目标。我们的仿真模型包含“动作所有者”,例如人工操作员,机器,机器人等,还包含由一个或多个动作组成并且独立于任何特定动作所有者的“单元过程”。采用这种模型的实时调度系统可以可视化与情况变化相对应的流程之间动作所有者的动态交换,从而有助于在人机协作制造环境中实现大规模定制生产。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号