From October 1997 to February 1998,MidAmerican energy Company in cooperation with the Iowa department of fnatural resources,the U.S.EPA and iowa State university,conducted removal activities at 4 MGP sites.one site was under EPA lead and three sites were under kState of IOWA lead.Approxiately 25,000 tons of soil was excavated and thermally treated.the multisite bundling of htis rject and the cooperation betwen all aprties saved MidAmerican Energy Company approximately
展开▼
机译:1997年10月至1998年2月,美国中部能源公司与爱荷华州自然资源部,美国环境保护署和爱荷华州立大学合作,在4个MGP场地进行了清除活动。其中一个场地由EPA牵头,三个场地由IOWA州管辖。铅。大约25,000吨的土壤被开挖并进行了热处理。htisject的多站点捆绑和所有参与者之间的合作节省了MidAmerican Energy Company大约