首页> 外文会议>aEngineering tommorow's today! >Risk ManagementObservations and Lessons Learned
【24h】

Risk ManagementObservations and Lessons Learned

机译:风险管理观察和经验教训

获取原文
获取原文并翻译 | 示例

摘要

This paper describes some observations and lessons learned from over ten years ofrndoing risk management at the Air Force Aeronautical Systems Center (ASC), Wright-PattersonrnAir Force Base, Ohio. This work is based on implementing the ASC Integrated Risk Managementrn(IRM) process at Wright-Patterson and other government and industry facilities. It alsornprovides an overview of the Aeronautical Systems Center’s Integrated Risk Assessment (IRA)rnapproach.rnThis paper discusses lessons learned from performing the three parts of an integrated risk assessment:rnthe Technical Assessment, the Schedule Assessment and the Cost Estimate. It coversrntheir interaction and interrelationship when accomplishing each of the three parts. It also presentsrnlessons learned from the other major tasks required of a healthy risk management process.rnThe highlights of this paper come from approximately thirty different risk assessments performedrnby the author, visits to many government program offices, visits to contractor facilities,rnand annual surveys accomplished at ASC.
机译:本文介绍了在俄亥俄州赖特-帕特森空军基地的空军航空系统中心(ASC)进行了十多年的风险管理后所获得的一些观察和经验教训。这项工作的基础是在Wright-Patterson以及其他政府和行业机构实施ASC集成风险管理(IRM)流程。它还提供了航空系统中心的综合风险评估(IRA)方法的概述。本文讨论了从执行综合风险评估的三个部分中汲取的教训:技术评估,进度评估和成本估算。它涵盖了完成这三个部分中的每一个时的相互作用和相互关系。本文还重点介绍了作者进行的大约三十种不同的风险评估,对许多政府计划办公室的访问,对承包商设施的访问,以及在年度完成的年度调查。 ASC。

著录项

  • 来源
    《aEngineering tommorow's today!》|2003年|1241-1253|共13页
  • 会议地点 Arlington VA(US)
  • 作者

    G. Jeffrey Robinette;

  • 作者单位

    Engineering DirectoraternSystems Engineering Divisionrn2530 Loop Road WestrnWright Patterson AFB, OH 45433-7101;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 系统工程;
  • 关键词

  • 入库时间 2022-08-26 14:03:56

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号