1 Structure the best TEAM for the job 2 Detailed and solid bottom-up estimate 3 Focus on constructability and innovation 4 Schedule optimization and buy-in by all 5 Right-size the construction staffing 6 Hire the right, qualified craft 7 Implement Safety and Quality procedures 8 Plan - Plan - Plan 9 Utilize detailed, accurate and transparent project controls10 Maintain a clean, safe, organized site and protect the environment.
展开▼
机译:1为工作安排最佳的TEAM 2进行详细而可靠的自下而上的估算3专注于可施工性和创新4所有人进行时间表优化和认可5合理确定施工人员的人数6雇用合适的合格手艺7实施安全和质量程序8计划-计划-计划9利用详细,准确和透明的项目控制\ r \ n10保持清洁,安全,有条理的场地并保护环境。