【24h】

Environmental Impact of 25 Years of Trans-Alaska Pipeline Operation

机译:跨阿拉斯加管道运营25年对环境的影响

获取原文
获取原文并翻译 | 示例

摘要

In 2001, the Trans Alaska Pipeline System (TAPS) owners produced a comprehensive analysis of the impacts associated with the renewal of the TAPS rights-of-way. The resulting report, Environmental Report for the Trans Alaska Pipeline System Right-of-Way Renewal, (TAPS Owners, 2001) described the physical, biological, and socio-economic impacts of right-of-way renewal ―and of non-renewal. The Environmental Report followed the guidelines of the Council on Environmental Quality for preparing environmental impact statements (EISs). Since projections of future impact of TAPS operation closely follow post-construction impacts since 1977, an assessment of the impact of 25 years of operation of a warm oil pipeline in cold regions can be described. This paper reviews the results of the report with special emphasis on physical impacts. Because the pipeline system has been in continuous operation since 1977 and is under stringent regulatory controls, its effects on the physical environment ―terrestrial, air quality, and water quality ―are known to be relatively minor and can reasonably be expected to continue without significant change. Justification for predictions of low impact can be summarized in the following conclusions: 1. The TAPS pipeline and related facilities already exist with known, observable impacts; 2. Major changes to the pipeline system or to the affected physical environment are not expected; 3. New surface-disturbance areas associated with TAPS will be small and isolated; 4. There would be no unavoidable adverse effect on the physical environment that would not be mitigated to the extent technically feasible; 5. Declining throughput could result in lower emissions and discharges affecting air and water quality.
机译:2001年,跨阿拉斯加管道系统(TAPS)所有者对与续签TAPS通行权相关的影响进行了全面分析。结果报告《跨阿拉斯加管道系统通行权更新的环境报告》(TAPS所有者,2001年)描述了通行权更新和不续费的物理,生物和社会经济影响。 《环境报告》遵循了环境质量委员会的指导方针,用于编制环境影响报告(EIS)。自1977年以来,由于对TAPS作业的未来影响的预测紧随施工后的影响,因此可以描述对寒冷地区的暖油管道运营25年的影响的评估。本文回顾了报告的结果,并特别强调了物理影响。由于该管道系统自1977年以来一直在连续运行,并且受到严格的监管控制,因此它对物理环境(陆地,空气质量和水质)的影响相对较小,可以合理地预期在没有重大变化的情况下继续进行。预测低影响的理由可以归纳为以下结论:1. TAPS管道和相关设施已经存在,具有已知的,可观察的影响; 2.预计不会对管道系统或受影响的物理环境进行重大更改; 3.与TAPS有关的新的表面扰动区域将很小并且是孤立的; 4.不会对物理环境造成不可避免的不利影响,而这种不利影响无法在技术上可行的范围内减轻; 5.吞吐量下降可能会导致排放量和排放量降低,从而影响空气和水的质量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号