【24h】

Wind-Induced Vibration Monitoring Program For Alpine Pipelines

机译:高山管道风振监测程序

获取原文
获取原文并翻译 | 示例

摘要

As part of the Alpine development project, Phillips Alaska, Inc. has installed a 305 mm (12-inch) diameter utility line and a 356 mm (14-inch) diameter produced oil line between the Alpine and Kuparuk oil fields on the Alaskan North Slope. In sections of the pipeline alignment that are oriented nominally perpendicular to the prevailing wind directions, a system of pipeline vibration dampers (PVDs) has been installed to mitigate potential fatigue damage due to wind-induced vibration (WIV). As part of the right-of-way agreement for the pipelines, Phillips has implemented a pipeline WIV monitoring program with the objectives of insuring that the PVD systems are performing as designed and to confirm that the spans without PVDs are not experiencing frequent and significant WIV. The Alpine WIV monitoring systems represent the most extensive, long-term WIV monitoring program ever undertaken on the North Slope. This paper provides an overview of the Alpine pipelines WIV monitoring program including; a description of the layout of the instrumentation, the data acquisition and the power supply systems, and a description of commissioning these systems. A summary of the WIV monitoring approach and the pertinent wind observation and vibration data gathered is also provided. The paper concludes with a summary of the overall findings and conclusions from this program.
机译:作为Alpine开发项目的一部分,菲利普斯阿拉斯加公司(Phillips Alaska,Inc.)在阿拉斯加北部的Alpine和Kuparuk油田之间安装了一条305毫米(12英寸)直径的公用事业管线和一条356毫米(14英寸)直径的采油管线。坡。在管道校准的标称垂直于盛行风向的部分中,安装了管道减振器(PVD)系统,以减轻由于风振(WIV)引起的潜在疲劳损伤。作为管道通行权协议的一部分,菲利普斯(Phillips)实施了管道WIV监控程序,以确保PVD系统按设计运行,并确认没有PVD的跨度不会频繁出现重大的WIV。 。高山WIV监测系统代表了北坡有史以来最广泛的WIV长期监测计划。本文概述了Alpine管道WIV监控程序,包括:仪器布局,数据采集和电源系统的说明,以及调试这些系统的说明。还提供了WIV监视方法的摘要以及收集的相关风向观测和振动数据。本文最后总结了该程序的整体发现和结论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号