首页> 外文会议>Electronics, Robotics and Automotive Mechanics Conference, 2009. CERMA '09 >Empirical Transformation of Job Shop Scheduling Problem to the Hydraulic Networks Problem in a Water Distribution System
【24h】

Empirical Transformation of Job Shop Scheduling Problem to the Hydraulic Networks Problem in a Water Distribution System

机译:配水系统中车间作业调度问题向水力网络问题的经验转化

获取原文

摘要

In this paper an analogy of the Job Shop Scheduling Problem to the Hydraulic Networks Problem is presented by mapping this model of scheduling, using as a base the disjunctive graph model. The mapping carried out allows visualization of the Hydraulic Networks problem as an NP-complete model with constraints defined in the Job Shop Scheduling Problem. The mapping presented indicates that the Hydraulic Networks Problem is a difficult problem to solve by using an approach with the constraints of an NP-complete problem.
机译:本文通过映射该调度模型,并以分离图模型为基础,提出了作业车间调度问题与液压网络问题的类比。进行的映射允许将液压网络问题可视化为NP完整模型,并在Job Shop Scheduling Problem中定义了约束。呈现的映射表明,通过使用具有NP完全问题约束的方法,水力网络问题是一个难以解决的问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号