A Phased Approach to Test Programs to Meet Feasibility Study Requirements

机译:满足可行性研究要求的测试程序的分阶段方法

获取原文
获取原文并翻译 | 示例

摘要

The role and importance of a well designed test work program during the development of an orebodyrnis often underestimated. A test work program should be tailored to deliver very specifi c answersrnto relevant questions. With a clear purpose, the results from the test work program will enhancernthe outcome of the feasibility study and provide the information required to meet the requirementsrnof all stakeholders. With regard to test work programs there are three main areas that should bernconsidered: orebody characterisation and defi nition, process fl ow sheet development and engineeringrndesign information.rnOrebody defi nition relies on reliable analytical methods to characterise and assess the economicrnminerals present in the ground. In mineral sands, the physical processing characteristics of thernminerals play a signifi cant role in the defi nition of an orebody. The analytical method thereforernhas to be customised using a combination of laboratory techniques. These techniques can includernheavy liquid separation, gravity separation and magnetic separation and are usually combined withrnchemical and mineralogical analyses to create a picture of the orebody. During the defi nition phasernof test work programs, an appropriate analytical technique has to be developed to evaluate drillingrnsamples, but also to support the information collected during fl ow sheet development.rnProcess fl ow sheet development is usually done once there is a reasonable understanding of the sizernand variability of the orebody. Selecting the best sample for test work is critical, as any fl ow sheetrndesign is tied to the specifi c characteristics of the sample used for development. There are otherrnfactors that can improve the outcomes of fl ow sheet development test work, including the skills andrnknowledge of the operator and allowing suffi cient time to process and analyse the results. Very oftenrnthis work is conducted under pressure with limited time and resources, only to result in a suboptimalrnfl ow sheet. During this phase of fl ow sheet test work, iterative testing will provide the informationrnrequired to develop an optimal metallurgical fl ow sheet. The data collected will provide indicativernrecoveries and yields that are required for feasibility studies.rnEquipment specifi cation is often included as part of process fl ow sheet development. This includesrncomparative test work between different equipment suppliers, assessment of operating conditionsrnsuch as the loading to determine the number of processing units required, as well as other designrninformation required such as particle size distributions, density and operating temperatures.rnWhile restricting the time and costs expended on test work programs may seem to meet a short termrnneed to meet investor requirements, neglecting to develop a proper framework of the requirementsrnthat has to be met in the long-term can lead to signifi cant long-term cost overruns. This is mainly duernto a need to repeat test work, or do confi rmation test work, as insuffi cient information was collectedrnduring the initial program.
机译:精心设计的测试工作程序在矿石生产过程中的作用和重要性经常被低估。测试工作计划应量身定制,以针对相关问题提供非常明确的答案。为了明确目的,测试工作计划的结果将增强可行性研究的结果,并提供满足所有利益相关者要求的信息。关于测试工作计划,应考虑三个主要领域:矿体表征和定义,工艺流程开发和工程设计信息。矿体定义依赖可靠的分析方法来表征和评估地下经济矿物。在矿物砂中,矿物的物理加工特性在矿体的定义中起着重要作用。因此,必须结合实验室技术来定制分析方法。这些技术可包括重液分离,重力分离和磁分离,通常与化学和矿物学分析相结合以产生矿体图。在定义阶段的测试工作程序中,必须开发一种适当的分析技术来评估钻探样品,同时也要支持在流程表开发过程中收集的信息。流程流程表的开发通常是在对流程的合理理解之后进行的。矿体的大小和变异性。选择最佳的样品进行测试是至关重要的,因为任何流片设计都与用于开发的样品的特定特性有关。还有其他因素可以改善工作流程开发测试工作的结果,包括操作员的技能和知识,并留出足够的时间来处理和分析结果。通常,这项工作是在有限的时间和资源的压力下进行的,仅导致次优的工作表。在此流程板测试工作阶段,迭代测试将提供开发最佳冶金流程板所需的信息。收集的数据将提供可行性研究所需的指示性回收率和产率。设备规范通常包含在工艺流程开发的一部分中。其中包括不同设备供应商之间的比较测试工作,评估运行条件(例如确定所需处理单元数量的负载)以及所需的其他设计信息(例如粒度分布,密度和工作温度)。同时限制了花费的时间和成本测试工作计划似乎满足了满足投资者要求的短期需求,而忽略了制定长期必须满足的要求的适当框架,则可能会导致长期的成本超支。这主要是由于需要重复测试工作或进行确认测试工作,因为在初始程序期间收集到的信息不足。

著录项

  • 来源
  • 会议地点 Perth(AU);Perth(AU)
  • 作者

    E Williams; E Dardengo;

  • 作者单位

    Allied Mineral Laboratories, Unit 7, 14 King Edward Road, Osborne Park WA 6017. Email: williams.elana@gmail.com;

    Allied Mineral Laboratories, Unit 7, 14 King Edward Road, Osborne Park, WA 6017. Email: edardengo@allminlabs.com;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿物学;矿物学;
  • 关键词

  • 入库时间 2022-08-26 14:04:10

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号