首页> 外文会议>NASTT's No-Dig Show 2018 - Full Conference Proceedings >Tying Up Loose Ends: Rehabilitating the Downstream End of an Egg-Shaped Brick Interceptor Near Boston
【24h】

Tying Up Loose Ends: Rehabilitating the Downstream End of an Egg-Shaped Brick Interceptor Near Boston

机译:捆扎松散的一端:修复波士顿附近一个蛋形砖块拦截器的下游端

获取原文
获取原文并翻译 | 示例

摘要

The City of Revere, Massachusetts maintains and operates 99 miles of aging sanitary sewer pipes. After decades of neglect and deferred maintenance, the City embarked on a comprehensive rehabilitation program of their sewer collection system. The rehabilitation work included the lining of approximately 2,500 linear feet of a 100-year old, egg-shaped, brick interceptor that conveys 95% of the City’s wastewater flow. A majority of the interceptor was rehabilitated in the first phase of the program in 2011, leaving only the three most downstream pipe sections remaining for rehabilitation. The rehabilitation of these three crucially important sections of 36” x 40” brick trunk sewer included challenging constructability issues such as bypass pumping, pipe size changes between manhole access points, permitting and coordination with the local regional sanitary sewer authority and the Department of Transportation, as well as bad weather and tide cycles.This paper will detail the significant challenges faced by the City and contractors during the rehabilitation of the brick interceptor including unique access issues at the suction manhole, bypass pumping discharge coordination with the Massachusetts Water Resource Authority (MWRA) at the downstream manhole located in the middle of a tidally influenced waterbody, and traffic management and planning within a heavily traveled, state-owned, parkway critical for commuters heading into the City of Boston. This paper will also discuss design challenges such as selecting the proper rehabilitation products, pipe size changes without manhole access, deteriorating brick infrastructure with active infiltration, and thickness requirements for an egg-shaped, 25-foot-deep brick sewer pipe.
机译:马萨诸塞州里维尔市维护和运营着99英里长的老化卫生污水管。经过数十年的忽视和延后的维护,纽约市开始了下水道收集系统的全面修复计划。修复工作包括使用100年历史的卵形砖块拦截器大约2500线性英尺的衬砌,该管道可输送纽约市95%的废水流量。在该计划的第一阶段,大部分拦截器在2011年进行了修复,仅剩下三个最下游的管道段需要修复。对这36英寸x 40英寸砖干下水道的这三个至关重要的部分的修复包括具有挑战性的可施工性问题,例如旁通泵,检查井口之间的管道尺寸变化,与当地区域性下水道主管部门和交通运输部的许可和协调, \ r \ n本文将详细介绍纽约市和承包商在砖块拦截器修复过程中面临的重大挑战,包括在抽水井口的独特出入问题,与马萨诸塞州水资源协调的旁通抽水排放位于受到潮汐影响的水体中间的下游沙井管理局(MWRA),以及在交通繁忙,国有的大路内的交通管理和规划,对于通向波士顿市的通勤者来说至关重要。本文还将讨论设计挑战,例如选择合适的修复产品,在没有人孔的情况下改变管道尺寸,使具有主动渗透功能的砖基础设施恶化,以及蛋形25英尺深的下水道砖的厚度要求。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号