首页> 外文会议>NASTT's No-Dig Show 2018 - Full Conference Proceedings >Billings Heights Uses HDD and Jack-and-Bore to Install New 24-inch and 12-inch Lines
【24h】

Billings Heights Uses HDD and Jack-and-Bore to Install New 24-inch and 12-inch Lines

机译:Billings Heights使用硬盘和千斤顶安装新的24英寸和12英寸生产线

获取原文
获取原文并翻译 | 示例

摘要

The County Water District of Billings Heights maintains more than 120 miles of pipe in Billings Heights, a suburb of Billings, the largest city in the state of Montana. Spurred by the energy boom, growth has been substantial through the last decade in Billings and the surrounding area.To accommodate growth, the District decided to upgrade their existing water distribution system, previously at its maximum capacity, by adding new transmission lines and a reservoir. The new transmission line includes over one mile of 24-inch diameter pipe and nearly 1.5 miles of 12-inch diameter pipe. Once complete, the 24-inch pipeline will convey water from the new 4-million-gallon Ox Bow Reservoir and will allow the District to retire three existing booster pump stations that will then only be used in times of emergency. The presence of several obstacles along the alignment that needed to be crossed without being disturbed required installation by horizontal directional drilling (HDD) and jack-and-bore methods. Due to the sensitivity of the surface, some sections of the 12 and 24-inch transmission lines were required to be installed within a casing pipe.The initiation of the watermain upgrade efforts, the decision process and procedures used to determine suitable materials and accommodate the sensitivity of the project location, and the various trenchless methods selected to lessen costs and environmental impacts will be discussed thoroughly in this paper. The main focus will be on the installation of water transmission mains at the highway, wetland and irrigation canal crossings.
机译:比灵斯高地县水区在比灵斯的郊区比灵斯高地维护着超过120英里的管道,比灵斯是蒙大拿州最大的城市。在能源繁荣的刺激下,过去十年来在Billings及其周边地区实现了可观的增长。\ r \ n为了适应增长,该地区决定通过增加新的输电线路来升级其现有的配水系统(以前是最大容量)和一个水库。新的传输线包括超过一英里的24英寸直径的管道和近1.5英里的12英寸直径的管道。一旦完工,这条24英寸长的管道将从新的400万加仑的牛弓水库中输送水,并使该地区退役三个现有的增压泵站,这些泵站仅在紧急情况下使用。沿路线存在多个障碍物,这些障碍物需要通过水平定向钻探(HDD)和千斤顶钻孔法进行安装,而不会受到干扰。由于表面的敏感性,需要在套管内安装12英寸和24英寸传输线的某些部分。\ r \ n水管升级工作的启动,用于确定合适材料的决策过程和程序并适应项目地点的敏感性,本文将详细讨论为降低成本和环境影响而选择的各种非开挖方法。主要重点将是在高速公路,湿地和灌溉渠道口安装输水总管。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号