首页> 外文会议>Design amp; construction of super amp; mega yachts >MANAGING THE MEGA-YACHT’S WASTEWATER STREAM
【24h】

MANAGING THE MEGA-YACHT’S WASTEWATER STREAM

机译:管理巨型游艇的废水流

获取原文
获取原文并翻译 | 示例

摘要

IMO Resolution MEPC 227(64) has changed the rules governing the use of on-board wastewater treatment plant and impacts the design and construction of mega-yachts, as the revised regulation makes some existing plant incompatible. This paper will outline the impact of MEPC 227(64) for larger PYC yachts with more than 12 passengers and discusses the limitations of various technologies and the design and technical implications of under-specifying wastewater treatment plant. Referring to case studies involving the installation of wastewater systems aboard a number of high profile mega-yacht projects, the paper will explain how designers can reduce the space required for water treatment plant without impacting treatment capacity and performance.rnThe paper will go on to explore the technical challenges faced when ACO Marine designed a wastewater treatment system to meet the limited, very narrow space aboard one particular prestigious project.
机译:IMO决议MEPC 227(64)更改了船上废水处理厂的使用规则,并影响了大型游艇的设计和建造,因为修订后的法规使某些现有工厂不兼容。本文将概述MEPC 227(64)对拥有12名以上乘客的大型PYC游艇的影响,并讨论各种技术的局限性以及污水处理厂规格不足的设计和技术含义。参照涉及在多个大型游艇项目上安装废水系统的案例研究,本文将解释设计人员如何在不影响处理能力和性能的情况下减少水处理厂所需的空间。rn本文将继续探索ACO Marine设计废水处理系统以满足一个特殊的有名望项目中有限的非常狭窄的空间时所面临的技术挑战。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号