This paper presents calculated wave heights and predicted erosion of upstream leveernslopes at the Loxahatchee Reservoir (also termed L-8 Reservoir) during Hurricane Jeanne inrnSeptember 2004. The Loxahatchee Reservoir is located in western Palm Beach County,rnFlorida, and is a key component of the Comprehensive Everglades Restoration Plan (CERP),rna Federal/State project to improve water quality and the distribution of fresh water in southrnFlorida. The reservoir will assist in restoring historic flows to the Loxahatchee River, and willrnprovide additional water supply to the city of West Palm Beach.rnThe L-8 Reservoir was constructed during the period 2003-2008 in previously-minedrnlimestone quarry cells that were deepened by hydraulic dredging to El. –42 ft (NAVD-1988).rnPerimeter embankments were constructed of sandy overburden to El. +23 ft around thernreservoir to provide overtopping protection as well as additional water storage. The reservoirrnwas constructed by the quarry owner (Palm Beach Aggregates, Inc.) to specificationsrnestablished by the South Florida Water Management District (SFWMD), the owner andrnoperator of the reservoir facility. BCI Engineers & Scientists, Inc. was the Engineer of Recordrnfor the earthwork design and construction monitoring, and Phillips & Jordan, Inc. was thernGeneral Contractor.rnThe determination of freeboard required to prevent overtopping or excessive overwashrnduring major hurricanes, and the assessment of potential erosion due to wave action, havernbeen major design issues for CERP reservoirs. This is due to the major cost implications ofrnhigher embankment heights as well as the high cost of armoring interior slopes againstrnexcessive erosion caused by wind-driven waves. Computations of wave height, wave setup,rnrun-up, overtopping/overwash, and embankment erosion are used to meet these objectives.rnThe methodology used in this study includes application of the USACE (2006) CoastalrnEngineering Manual method for wave run-up and overtopping computation, the SWAN wavernmodel for wave distribution in the reservoir, and the SBEACH erosion model.rnDuring early mining activities at the quarry, a temporary north (Phase 1) perimeter leveernwas constructed, prior to the establishment of design criteria and construction specifications byrnSFWMD. This embankment had 3H:1V upstream slopes that were grassed. The embankmentrnfill was typical sandy overburden compacted by haul trucks and bulldozers. Prior to finalrnconstruction of this levee to SFWMD specifications, which included 4H:1V slopes, and soilrncement slope protection in critical areas, Hurricane Jeanne passed through the area and thernnorth interior slopes of the temporary perimeter levee experienced significant erosion due tornwave action.rnBased on hurricane wind direction, velocity, and time of passage data from the NationalrnOceanic and Atmospheric Administration (NOAA), which were used as input to the SWANrnmodel, the appropriate wave height distribution was input to the Coastal Engineering Model,
机译:本文介绍了2004年9月飓风吉恩飓风期间Loxahatchee水库(也称为L-8水库)上游波罗的坡度和预计的侵蚀。Loxahatchee水库位于佛罗里达州西部的棕榈滩县,是佛罗里达州的重要组成部分。佛罗里达州南部的综合湿地恢复计划(CERP),rna联邦/州项目,旨在改善水质和淡水的分配。该水库将有助于恢复流向Loxahatchee河的历史流量,并将为西棕榈滩市提供更多的供水。rnL-8水库是在2003年至2008年期间由先前开采的石灰石采石场建造的,该水库通过水力加深了疏El到El。 –42英尺(NAVD-1988)。rn周边路堤由覆盖El的砂土覆盖层构成。在水库周围+23英尺,以提供防倾覆保护和额外的储水功能。水库由采石场所有者(Palm Beach Aggregates,Inc.)按照水库设施的所有者和经营者南佛罗里达水管理区(SFWMD)制定的规范建造。 BCI工程师与科学家公司是Recordrn的土方工程设计和施工工程师,而Phillips&Jordan,Inc.是总承包商。rn确定干舷以防止在主要飓风中超调或过度冲刷,以及对潜在侵蚀的评估由于波浪作用,已经成为CERP油藏的主要设计问题。这是由于路堤高高带来的主要成本影响,以及防风浪造成的过分侵蚀的铠装内部斜坡的高昂成本。为了实现这些目标,使用了波浪高度,波浪形成,波浪上升,过顶/过度冲刷和路堤侵蚀的计算。本研究中使用的方法包括应用USACE(2006)CoastalrnEngineering手册方法进行波浪上升和过顶在采石场的早期采矿活动期间,在由rnSFWMD建立设计标准和施工规范之前,构造了一个临时的北部(第1阶段)周长堤坝。该路堤上游有3H:1V的草坡。路堤填土是典型的沙质覆盖层,由卡车和推土机压实。在最终按照SFWMD规范建造堤防之前,其中包括4H:1V斜坡和关键区域的防污斜坡保护,珍妮飓风穿过该区域,临时围堤的北内坡由于波浪作用而遭受了严重侵蚀。来自美国国家海洋和大气管理局(NOAA)的风向,风速和通过时间的数据被用作SWANrn模型的输入,适当的波高分布被输入到了沿海工程模型中,

著录项

  • 来源
    《Dam safety 2009》|2009年|p.1-15|共15页
  • 会议地点 Hollywood FL(US);Hollywood FL(US)
  • 作者

    Les Bromwell; Kenneth Ying;

  • 作者单位

    BCI Engineers Scientists, Inc., Lakeland, Florida;

    rnFormerly BCI Engineers Scientists, Inc.;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 TV698.23;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号