首页> 外文会议>Dam safety 2005 >DON’T JUDGE THE BOO BY IT’S COVER; EXPERIENCES WITH POTENTIAL FAILURES MODES ANALYSIS
【24h】

DON’T JUDGE THE BOO BY IT’S COVER; EXPERIENCES WITH POTENTIAL FAILURES MODES ANALYSIS

机译:不要以封面来判断嘘声;潜在故障模式分析的经验

获取原文
获取原文并翻译 | 示例

摘要

In the summer of 2001, the Colorado Dam Safety Branch (DSB) personnel conducted a rnpilot program using the Potential ailure Modes Analysis (PFMA) process on selected dams. rnUnder the guidance of Larry Von Thun, DSB personnel went through the process of evaluating rnselected dams with the intent to determine the required workload required for an analysis, and rnto provide expertise toward development of a standardized program for more efficient rnevaluations. A total of eight dams were evaluated during the course of the pilot program.The result of this effort was to gain an understanding of the PFMA process itself, and to rnbetter understand the concepts of how various failure modes can affect a dam. In the course of rnthe program, the several dam owners came to better understand the Colorado dam safety rnprogram, and more importantly, to better understand their dams, and how dam safety rnpersonnel may have reason to express safety concerns. An additional feature of the process rnwas to gain a better perspective to the operation of the dam safety program, and to identify rnstrengths and weaknesses in the inspection program. rnWith the experience from the pilot program, and the DSB is moving forward to develop a rnstandardized program with the goal of streamlining the process toward performing PFMA rnstudies on a routine basis. With approximately 2000 dams in the inventory, of which rnapproximately 700 are significant hazard structures, it is hoped that a more standardized rnapproach will facilitate an ongoing review. rnTo further aid the effort toward PFMA evaluations, the DSB, in conjunction with the rnUSBR, is developing a ailure Assessment Index (FAI) to profile the dam inventory and rnhighlight dams that pose the greater risk of failure. Dams posing a greater risk based upon the rnAI will he selected for closer review and evaluation, and any necessary resources to effect rnany repairs and modifications that may be warranted.
机译:在2001年夏天,科罗拉多大坝安全分公司(DSB)的人员使用了潜在水灾模式分析(PFMA)过程对选定的大坝进行了先导计划。在拉里·冯·图恩(Larry Von Thun)的指导下,DSB人员经历了评估选定大坝的过程,目的是确定分析所需的工作量,并为开发标准化计划提供专业知识,以便进行更有效的评估。在试点计划的过程中,总共对八座水坝进行了评估。这项工作的结果是加深了对PFMA过程本身的了解,并更好地理解了各种故障模式如何影响水坝的概念。在实施该计划的过程中,几位大坝所有者开始更好地了解科罗拉多大坝安全计划,更重要的是,更好地了解了他们的大坝,以及大坝安全人员可能如何表达安全担忧。该过程的另一个特点是可以更好地了解大坝安全计划的运作,并确定检查计划中的强项和弱项。 rn从试点计划中获得的经验,DSB正朝着开发标准化程序的方向发展,其目标是简化流程,以常规方式执行PFMA研究。清单中约有2000座水坝,其中约700座是重要的危险结构,希望采用更标准化的rnapproach可以促进正在进行的审查。为了进一步帮助进行PFMA评估,DSB与rnUSBR一起制定了故障评估指数(FAI),以对可能造成更大故障风险的大坝库存和高亮坝进行剖析。他将选择基于rnAI构成更大风险的水坝,以进行更详细的检查和评估,并选择任何必要的资源进行必要的修理和修改。

著录项

  • 来源
    《Dam safety 2005》|2005年|1-15|共15页
  • 会议地点 New Orleans LA(US);New Orleans LA(US)
  • 作者

    Greg Hammer;

  • 作者单位

    Greeley, Colorado rnColorado Division of Water Resources, Dam Safety Branch;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng