Rush Creek Meadows Dam, a 50-foot high concrete arch dam located at 9,500 feetrnelevation on the eastern slope of the Sierra Nevada, was evaluated for stability for thernProbable Maximum Flood (PMF). While the dam section proved to be stable, the spillwayrnsection was not. After several refinements to the analysis failed to demonstrate stability,rnSouthern California Edison (SCE) made the decision to install post-tensioned grouted anchors.rnDrilling and installing anchors at the dam presented several challenges. Located in arnU.S. Forest Service Wilderness area, transportation to and from the dam was limited to foot orrnanimal. Helicopter flights were strictly limited to equipment too heavy or bulky to transport byrnmule. Remoteness of the site required building a camp to support the work crews around thernclock. Strict environmental controls were required to protect the stream and surrounding area.rnAlmost from the start, weather patterns were shifting toward winter conditions, with snow andrncold on the horizon.rnSCE’s contractor used percussion drilling to create the boreholes for the anchors, evenrnthough the spillway section was relatively thin. Several of the holes failed water testing,rnrequiring consolidation grouting and redrilling. With freezing temperatures and mixingrnproblems, grout curing setbacks occurred. The tension-testing and lock-off loading wererncompleted with several feet of snow on the ground and winter storms looming.rnSCE and its contractor completed the installation of the ten post-tensioned anchors inrn74 days. The project required over 200 mule trips and 86 helicopter flights to deliver andrnretrieve materials, supplies, and personnel.
机译:Rush Creek Meadows大坝是一座50英尺高的混凝土拱坝,位于内华达山脉东坡,海拔9,500英尺,对最大可能洪水(PMF)的稳定性进行了评估。虽然大坝断面是稳定的,但溢洪道断面却不稳定。在对分析进行多次改进后未能显示出稳定性之后,南加州爱迪生(SCE)决定安装后张预应力的灌浆锚。rn在大坝上钻孔和安装锚存在诸多挑战。位于arnU.S.森林服务荒野地区,往返大坝的交通仅限于脚踏。直升机的飞行严格限于设备过于沉重或笨重而无法运输。工地偏僻,需要建立一个营地以支持全天候的工作人员。需要严格的环境控制措施来保护河流和周围地区。rn从一开始,天气模式就朝着冬季条件转移,下着雪和寒冷.rn SCE的承包商使用冲击钻来为锚定孔,即使在溢洪道段比较薄。几个孔未能通过水测试,需要固结灌浆和重新钻孔。由于冻结温度和混合问题,发生了灌浆固化挫折。拉力测试和锁定载荷已完成,地面上有几英尺的积雪,冬季暴风雨也即将来临。SCE及其承包商在74天内完成了十个后张锚的安装。该项目需要200多次m子旅行和86架直升机飞行,以运送和取回材料,物资和人员。

著录项

  • 来源
    《Dam safety 2005 》|2005年|1-14|共14页
  • 会议地点 New Orleans LA(US);New Orleans LA(US)
  • 作者单位

    Southern California Edison Company, San Dimas, California;

    Southern California Edison Company, Bishop, California;

    Southern California Edison Company, San Dimas, Calfornia;

    MCS Construction, Inc., Clovis, California;

    Outten Engineering Company, Long Beach, California;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号