首页> 外文会议>Dam safety 2004 >THE EMERGENCY ACTION PLANS IN SPAIN
【24h】

THE EMERGENCY ACTION PLANS IN SPAIN

机译:西班牙的紧急行动计划

获取原文
获取原文并翻译 | 示例

摘要

The EAP’s are, nowadays, yet another a useful tool intended to minimize thernconsequences to the population, in case of a dam failure or malfunction. Spain, being aware ofrnthe new approach requested by modern society, developed in 1995 and 1996 the firstrnregulations on this matter, which included dam classification according to potential downstreamrnhazard and working out the EAP’s for those dams that posed a high or significant risk.rnThe classification process of 1200 large dams in Spain has produced an outcome of 85% ofrnthem showing as needing an EAP. This study has been carried out by studying those damsrndeemed as being potentially dangerous of causing damages downstream, in the event ofrnfailure or malfunction of the structure. These dams have been classified into three categories:rnA, B and C (High, Significant, and Low Hazard).rnAt present, the dam’s owners are developing most of these plans. Around 60 plans havernalready been approved, some of which are beginning to be implemented. The coordinationrntasks between different Governmental agencies involved in the emergency management havernalready begun and are the key to a quick and effective answer related to citizen’s protectionrnmatters.
机译:如今,EAP已成为又一个有用的工具,目的是在大坝发生故障或故障的情况下,尽量减少对居民造成的后果。西班牙意识到现代社会所要求的新方法,于1995年和1996年制定了关于该问题的第一条规定,其中包括根据潜在的下游危险对大坝进行分类,并为构成高风险或重大风险的大坝制定EAP。西班牙的1200座大坝中有85%的水坝成果表明需要EAP。这项研究是通过研究那些被认为具有潜在的危险的水坝进行的,这些水坝会在建筑物发生故障或故障时对下游造成损害。这些大坝分为三类:rnA,B和C(高,重大和低危害)。目前,大坝的所有者正在制定其中的大多数计划。大约有60项计划已经获得批准,其中一些计划已经开始实施。参与应急管理的不同政府机构之间的协调任务已经开始,并且是迅速有效地解决与公民保护有关的关键。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号