首页> 外文会议>Conference on Massmin 2000 Oct 29 - Nov 2, 2000, Brisbane, Queensland >An Application of Linear Programming for Block Cave Draw Control
【24h】

An Application of Linear Programming for Block Cave Draw Control

机译:线性规划在砌块掘进控制中的应用

获取原文
获取原文并翻译 | 示例

摘要

In the past various systems have been used to plan the extraction of ore from block cave operations. These systems have varied from rather sophisticated models with empirical 'gravity flow' rules applied to the very rudimentary models where only the recorded mined tonnage's have been accounted for against the available resource. The normal requirement of these models has been to only plan the movement of ground through the drawpoints. Little cognisance has been taken of the other parameters that affect the total mining operations. The intended purpose of the linear program planning system is to not only include the management, resource availability and geotechnical constraints, but to also include the mining rules. The paper will discuss the various constraints that have been considered, and attempt to illustrate where the system better serves the production system than previous ones. A brief technical discussion on the linear programming system is included.
机译:过去,已使用各种系统来计划从块状洞穴开采中开采矿石。这些系统与相当复杂的模型不同,这些模型将经验“重力流”规则应用到非常基本的模型,在这些模型中,仅记录的开采吨位是相对于可用资源而言的。这些模型的正常要求是仅计划通过引伸点的地面运动。对影响整个采矿作业的其他参数的了解很少。线性计划计划系统的预期目的不仅包括管理,资源可用性和岩土工程约束,而且还包括采矿规则。本文将讨论已考虑的各种约束,并试图说明该系统比以前的约束更适合生产系统。包含有关线性编程系统的简短技术讨论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号