首页> 外文会议>Conference on Massmin 2000 Oct 29 - Nov 2, 2000, Brisbane, Queensland >Geotechnical Aspects of Open Stope Design at BHP Cannington
【24h】

Geotechnical Aspects of Open Stope Design at BHP Cannington

机译:必和必拓坎宁顿露天采场设计的岩土工程方面

获取原文
获取原文并翻译 | 示例

摘要

Open stoping dimensions are typically controlled by a number of factors including production drilling capacity, scheduling, fill constraints, orebody dimensions and host wall rock conditions. Frequently host wall rock conditions are the key control on stope dimensions. As a new mine is brought into production, there is a steep geotechnical learning curve for those associated with the development of the mine. Initially, the experience and observations gained at other mines is used to guide the stope design. As experience is gained at the new operation, site specific techniques can be validated for use. This has been the case at BHP Cannington, where a heavy emphasis has been placed on the validation of empirical stope stability techniques for site specific conditions and experience. A range of empirical and numerical techniques can be applied during the design of open stopes. The empirical techniques are an experience based application of known performance levels during the design of open stopes. The numerical modelling and structural tools can be used to compliment the empirical techniques so that an understanding can be gained of the likely stress and structurally controlled failure mechanisms.
机译:露天矿的尺寸通常受许多因素控制,包括生产钻探能力,调度,填充约束,矿体尺寸和主体围岩条件。通常,宿主围岩条件是对采场尺寸的关键控制。随着新矿山的投产,对于那些与矿山开发有关的人来说,岩土技术学习曲线非常陡峭。最初,从其他矿山获得的经验和观察被用来指导采场设计。随着新操作经验的积累,可以验证特定于站点的技术以供使用。必和必拓坎宁顿就是这种情况,在该领域中,重点放在针对特定场所条件和经验的经验性采场稳定性技术的验证上。在露天采场的设计中可以应用一系列经验和数值技术。经验技术是在露天采场设计期间基于经验的已知性能水平的应用。数值建模和结构工具可用于补充经验技术,以便可以了解可能的应力和结构控制的破坏机理。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号