【24h】

MOORING BRIDGE CAISSONS DURING CONSTRUCTION USING JETTED-IN DRIVEN PLATE ANCHORS

机译:使用固定驱动板锚固定施工期间的系泊桥沉

获取原文
获取原文并翻译 | 示例

摘要

Driven plate anchors can be used to hold in place large bridge caissons during floating construction. Their small size and simple method of installation make them a very cost effective alternative to other direct-embedment, gravity, and drag anchors. The geotechnical design of plate anchors involves the anchor geometry, embedment, drivability, and proof testing. This paper describes the experience gained with plate anchors used during construction of the new Tacoma Narrows Bridge. For this project, the anchors had to be driven in dense to very dense sands, and had to resist large forces from 7-9 knot currents.
机译:从动板锚可用于在浮动施工中将大型桥梁沉箱固定在适当的位置。它们的小尺寸和简单的安装方法使其成为其他直接埋入式,重力式和阻力式锚的极具成本效益的替代方案。板锚的岩土工程设计涉及锚的几何形状,嵌入,可驱动性和验证测试。本文介绍了在新的塔科马窄桥的建造过程中使用板锚的经验。对于该项目,必须将锚杆打入致密的至非常致密的沙土中,并且必须抵抗7-9节的海流产生的大力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号