Risk Based Approach of a Gasworks Site

机译:煤气厂基于风险的方法

获取原文
获取原文并翻译 | 示例

摘要

In the centre of the city The Hague, a site of a former gasworks is present. The production of gas started at about 1907 and the production finished in 1967. Due to the production of gas, waste is buried in the surroundings. By now, the buildings of the former plant are removed and the location attains its full development. Contamination of soil and groundwater is observed in the past. The subsoil is contaminated with cyanides and (polycyclic) aromatics. Currently, there are no direct risks for humans or for the ecology due to use of the site, due to the depth at which the contamination is present and due to the fact that the groundwater at the site is not seeping towards the soil surface but infiltrating. Therefore, only the risk of migration of contaminants dissolved in the groundwater might remain. Several aspects related with the site and the contaminants are investigated in order to assess the risks of migration. These aspects are addressed in this paper.
机译:在城市海牙市中心,有一个以前的煤气厂。天然气的生产始于1907年,而生产于1967年结束。由于天然气的生产,废物被掩埋在周围。到现在为止,原来工厂的建筑物已被拆除,并且该位置已得到全面发展。过去观察到土壤和地下水的污染。底土被氰化物和(多环)芳烃污染。当前,由于场地的使用,污染存在的深度以及场地的地下水没有渗入土壤表面而是渗透的事实,对场地的使用对人类或生态没有直接风险。因此,仅保留溶解在地下水中的污染物迁移的风险。为了评估迁移的风险,研究了与现场和污染物有关的几个方面。本文讨论了这些方面。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号