首页> 外文会议>Conference on Connections Between Steel and Concrete Vol.2 Sep 10-12, 2001 Stuttgart, Germany >CONNECTIONS BETWEEN PRESTRESSED CONCRETE BRIDGE DECKS AND COMPOSITE BRIDGE DECKS -HYBRID CONSTRUCTION
【24h】

CONNECTIONS BETWEEN PRESTRESSED CONCRETE BRIDGE DECKS AND COMPOSITE BRIDGE DECKS -HYBRID CONSTRUCTION

机译:预应力混凝土桥梁甲板与复合桥梁甲板之间的连接-混合施工

获取原文
获取原文并翻译 | 示例

摘要

Bridges that can be constructed with prestressed concrete decks economically might lead to difficulties in some spans. These difficulties for example can be river-crossings. Here the question arises what is the best concept for the superstructure. The rigid connection between prestressed concrete bridge decks and composite bridge decks lead to economical solutions. Two applications are given: The new Isarbridge in Dingolfing/Bavaria shows the combination of prestressed concrete bridge decks in the approaches and composite bridge decks in the river area. In the approach-parts the decks are constructed with prefabricated pc-beams and the plate structure is cast in place. The longer spans are built as composite constructions. For the plate structure of the composite part semi-prefabricated concrete elements are used. While the Isarbridge is a beam bridge in both parts of the decks the river Donaubridge in Vilshofen/Bavaria connects prestressed concrete bridge decks with an arch bridge deck in the middle span. The topics of this article are the special problems in the connection zone.
机译:可以经济地用预应力混凝土甲板建造的桥梁可能会在某些跨度中导致困难。例如,这些困难可能是穿越河流。这里出现的问题是上层建筑的最佳概念是什么。预应力混凝土桥面板和复合桥面板之间的刚性连接带来了经济的解决方案。给出了两种应用:位于丁戈尔芬/巴伐利亚的新Isarbridge展示了引道中的预应力混凝土桥面板和河区的复合桥面板的结合。在引人入胜的部分中,甲板用预制的PC梁构成,而板结构则浇铸就位。跨度较长的建筑为复合结构。对于复合部件的板结构,使用半预制混凝土元件。 Isarbridge是桥板的两个部分,而Vilshofen / Bavaria的Donaubridge河则将预应力混凝土桥板与拱桥桥连接在中间。本文的主题是连接区域中的特殊问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号