【24h】

Weedon Flood Storage Scheme - the Biggest Hydro-Brakereg; in the World

机译:杂草蓄水方案-世界上最大的Hydro-Brake®

获取原文
获取原文并翻译 | 示例

摘要

The Northamptonshire villages around Weedon in the upper River Nene valley, suffered disastrous flooding in 1947, 1992 and 1998, with Weedon Bec being particularly badly affected. The channel through the village is constricted by historic developments and the opportunity to enlarge the channels was not available. Restricted culverts under the railway embankments downstream compounded the flood situation. To alleviate the problem the Environment Agency and Halcrow Group developed an upstream on-line storage reservoir scheme. The project includes a 450m long, 6.8m high clay embankment across the valley, with a culvert on the line of the original river channel to carry the controlled outflow. A 150m long concrete-block spillway carries excess flood flows over the embankment. The embankment site has been landscaped to minimise visual impacts and the borrow area has been developed into a large wetland area as a habitat for aquatic flora and fauna.
机译:内内河上游河谷Weedon附近的北安普敦郡村庄在1947年,1992年和1998年遭受了灾难性的洪灾,其中Weedon Bec受的影响尤其严重。穿越村庄的通道受到历史发展的限制,没有扩大通道的机会。下游铁路路堤下的受限制的涵洞加剧了洪水形势。为了缓解该问题,环境署和哈克劳集团开发了上游在线存储水库方案。该项目包括一条横跨山谷的450m长,6.8m高的粘土路堤,在原始河道的直线上有一个涵洞,以进行受控的流出。一条长150m的混凝土砌块溢洪道将过多的洪水流量带到路堤上。堤防场已进行了景观美化,以最大程度地减少视觉影响,并且借用区已发展成为一个大型湿地区域,作为水生动植物的栖息地。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号