首页> 外文会议>Concrete solutions >Natural draft cooling towers with flue gas inlet
【24h】

Natural draft cooling towers with flue gas inlet

机译:带有烟气入口的自然通风冷却塔

获取原文
获取原文并翻译 | 示例

摘要

After nearly twenty years of flue gas inlet in cooling towers the formerly used epoxy-based coatings did not protect the interior concrete surfaces of cooling towers for as long as had been expected. Even on surfaces coated again in the last 10 years degradation took place and supplementary coatings were needed. Therefore certain analyses and considerations were undertaken to find new solutions to reinforce the surface protecting coatings of the cooling towers so they could be operated for another period of 25 years. The execution of this project needed new and optimized methods to plan and carry out the implementation.
机译:经过将近二十年的烟气进入冷却塔后,以前使用的基于环氧的涂料无法长期保护冷却塔的内部混凝土表面。即使在最近十年中再次涂覆的表面上,也会发生降解,因此需要补充涂层。因此,进行了某些分析和考虑,以寻找新的解决方案来加强冷却塔的表面保护涂层,使其可以再使用25年。该项目的执行需要新的优化方法来计划和执行实施。

著录项

  • 来源
    《Concrete solutions》|2014年|719-726|共8页
  • 会议地点 Belfast(IE)
  • 作者单位

    IBOS Institute of Concrete Technology and Surface Protection GmbH, Bochum, Germany;

    Zerna Baumanagement GmbH, Bochum, Germany;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号