Implementation of Environmental Mitigation Measures in Diktel-Chyandanda District Road,Nepal

机译:尼泊尔Diktel-Chyandanda District Road实施环境缓解措施

获取原文
获取原文并翻译 | 示例

摘要

The Diktel-Chyandanda District Road (DCDR,48 km) was implemented under Rural Access Programme (RAP).The paper highlights implementation approach of environmental mitigation measures to avoid,reduce and minimize the negative impacts arising from the project and project induced activities,and augmentation of beneficial impacts.The conversion of nearly 34.0 ha land into road formation,which is irreversible in nature is the most significant negative environmental impact emerged due to the road construction.The mitigation measures implemented at the beginning through the project initiation period were found very supportive to maintain natural environment within acceptable limits.Other significant adverse environmental impacts observed during construction phase of DCDR include slope failure due to road construction,spoil disposal and sedimentation onto farm land,effects and disturbance to community infrastructure,utility services and natural drainage systems,loss of forest and agriculture production.The RAP implementation approach was labour based environmental friendly and participatory approach (LEP) - constructed in phases,first opening of trails and widening with structures and finishing works thereafter.The principles of this approach is labour based,including the use of hand tools,small machines,and equipment with total avoidance of explosives.Despite the environmentally sound approach,road construction had produced both beneficial and adverse environmental impacts in the project area.The project generated about 580,000 labour-days employment and US $ 1.80 million (NRs 120 million) incomes from road construction for the local people.In addition,local people had the opportunity of enhancing technical skills through training and working on income generation and road construction activities.The long-term benefits due to the construction of road are access to the goods,markets,and services,and thereby the alleviation of poverty.Apart from the irreversible environmental impacts,most of the negative impacts were mitigated to the extent possible during construction with remaining effects of some residual impacts during post construction phase.
机译:Diktel-Chyandanda District Road(DCDR,48 km)是在农村准入计划(RAP)下实施的。本文重点介绍了环境缓解措施的实施方法,以避免,减少和最小化项目和项目诱发的活动以及将近34.0公顷的土地转化为道路形成,这是不可逆转的,这是道路建设对环境造成的最严重的负面影响。在项目启动阶段的初期就发现了非常有效的缓解措施。在DCDR的施工阶段观察到的其他重大不利环境影响包括道路建设,弃土处置和农田上的沉积物,对社区基础设施的影响和干扰,公用事业服务和自然排水系统,森林和农业损失RAP的实施方法是基于劳动的环境友好和参与性方法(LEP)-分阶段建造,首先开放步道,然后进行结构扩建和整理工作。此方法的原理是基于劳动的,包括使用手工工具,小型机器和设备,完全避免使用炸药。尽管采用了无害环境的方法,道路建设对项目地区的环境产生了有利和不利的影响。该项目创造了约580,000个劳动日的工作日和180万美元(120卢比)百万美元)来​​自当地人民的道路建设收入。此外,当地人民有机会通过培训和从事创收和道路建设活动来增强技术技能。道路建设带来的长期利益是获得货物,市场和服务,从而减轻贫困。除了不可逆转的环境影响,大部分负面影响在施工过程中得到了最大程度的缓解,而在施工后阶段还产生了一些剩余影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号