首页> 外文会议>Computers in Railways X: Computer System Design and Operation in the Railway and other Transit Systems; WIT Transactions on Built Environment; vol.88 >The contribution of state resources in a constraint-based scheduling model for conflict solving at railway junctions
【24h】

The contribution of state resources in a constraint-based scheduling model for conflict solving at railway junctions

机译:国家资源在基于约束的调度模型中解决铁路枢纽冲突的贡献

获取原文
获取原文并翻译 | 示例

摘要

Scheduling is the process of allocating resources to activities over time. In a scheduling problem, resources are scarce and constrained in various ways (e.g. in the order of activities and the capacity of resources), and one is looking for a schedule of the activities that both satisfies the constraints and is optimal according to some criterion.rnOver the last decade, constraint-based scheduling (CBS) has become the dominant form of modelling and solving scheduling problems.rnThis paper deals with a CBS model of real time management of train traffic through junctions, it focuses on the use of state resources to improve the model of conflicts between trains running in opposite directions.
机译:计划是随时间分配资源到活动的过程。在调度问题中,资源是稀缺的,并且以各种方式受到约束(例如,按照活动的顺序和资源的能力),并且人们正在寻找既满足约束又根据某种标准最佳的活动的日程表。在过去的十年中,基于约束的调度(CBS)已成为建模和解决调度问题的主要形式。改进在相反方向运行的火车之间的冲突模型。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号