首页> 外文会议>CMI conference Beijing >Study on Load-sharing Pattern of Anti-slide Piles Control for Landslides with Pipeline Crossing
【24h】

Study on Load-sharing Pattern of Anti-slide Piles Control for Landslides with Pipeline Crossing

机译:管道穿越滑坡抗滑桩控制分担方式研究

获取原文
获取原文并翻译 | 示例

摘要

Long distance natural gas transmission pipelines were designed to cross the western mountain area,where safety depends on the stability of related landslides.Anti-slide piles are among the most effective reinforcement measures in the field of landslide improvement.The paper presents a load-sharing pattern study of anti-slide piles reinforcement against landslide with pipeline crossing.Based on the case study of typical landslide and natural gas transmission pipeline,the mechanical model of landslide and pipeline was performed,from which the mechanical analysis on deformation of the pipeline is carried out.By using the numerical modeling method,the load-sharing pattern of anti-slide piles,sliding mass and pipeline was analyzed in detailed.The result shows that there is clearly destructive stress concentration occurring at the back part of the pipeline,and the setting of the anti-slide piles can drastically reduce the load-sharing ratio of the pipeline.That is the reason why the anti-slide piles can provide protection of the pipeline in the aspects of stress and deformation.The proper setting of anti-slide piles can improve the state of stress on the pipelines,which is the crucial explanation for the reinforcement mechanism of anti-slide piles.
机译:设计长距离天然气输送管道穿越西部山区,那里的安全性取决于相关滑坡的稳定性。抗滑桩是滑坡改善领域最有效的加固措施之一。穿越管道的抗滑桩加固滑坡的模式研究。在典型滑坡和天然气输送管道的案例研究的基础上,建立了滑坡与管道的力学模型,并对管道的变形进行了力学分析。通过数值模拟的方法,详细分析了抗滑桩,滑动质量和管道的荷载分担方式。结果表明,在管道的后部明显存在破坏性应力集中。设置防滑桩可以大幅度降低管道的分担比,这就是防滑的原因桩基可以在应力和变形方面提供保护。适当设置抗滑桩可以改善管道上的应力状态,这是抗滑桩加固机理的关键解释。

著录项

  • 来源
    《CMI conference Beijing》|2012年|389-399|共11页
  • 会议地点 Beijing(CN)
  • 作者单位

    Ph.D Lecturer, Engineering Faculty, China University of Geosciences;

    No.388, Lumo Road, Wuhan 430074;

    Professor, Engineering Faculty, China University of Geosciences;

    No.388, Lumo Road, Wuhan 430074;

    Associate Professor, Engineering Faculty, China University of Geosciences;

    No.388, Lumo Road, Wuhan 430074;

    Professor, Engineering Faculty, China University of Geosciences;

    No.388, Lumo Road, Wuhan 430074;

    Master;

    Engineering Faculty, China University of Geosciences;

    No.388, Lumo Road, Wuhan 430074;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 U692.22;
  • 关键词

    Pipeline crossing; Landslide hazard; Anti-slide pile; Load sharing pattern; Reinforcement mechanism;

    机译:管道穿越;滑坡灾害;抗滑桩;荷载分担方式;加固机理;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号