首页> 外文会议>CMG (Computer Measurement Group) 2003 Proceedings Vol.1; Dec 7-12, 2003; Dallas, Texas >Web Load Testing Made Easy: Testing with WCAT and WAST for Windows Applications
【24h】

Web Load Testing Made Easy: Testing with WCAT and WAST for Windows Applications

机译:轻松进行Web负载测试:使用CAT和WASTE针对Windows应用程序进行测试

获取原文
获取原文并翻译 | 示例

摘要

Web performance is critical to the business bottom line. Whether it is a portal on your intranet for sharing vital corporate information or an eCommerce site to support your customer base; it is a key resource that must be understood, monitored and controlled. Service delivery is as important, if not more so, than for other mission critical applications. The main difference is that for a portal or eCommerce site, customers become aware of performance problems at the same time that you do. Poor response leads to site abandonment. You lose customers and they may never come back. This paper is presented in two parts. The first part details the general methodology for website capacity planning including the metrics to be measured and evaluated during and after the load test execution. A brief overview of load testing tools is also provided. The second part discusses specific details about the WCAT and WAST tools for evaluating performance of Windows websites. A case study is also presented detailing the use of the tools with some interesting performance findings that may be applicable to your environment.
机译:Web性能对于业务底线至关重要。无论是您的Intranet上用于共享重要公司信息的门户网站,还是支持您的客户群的电子商务网站;它是必须被理解,监视和控制的关键资源。服务交付与其他关键任务应用程序同样重要,甚至不那么重要。主要区别在于,对于门户网站或电子商务网站,客户会在执行操作的同时意识到性能问题。响应不佳导致网站被遗弃。您失去客户,他们可能永远也不会回来。本文分为两个部分。第一部分详细介绍了网站容量规划的一般方法,包括在负载测试执行期间和之后进行测量和评估的指标。还提供了负载测试工具的简要概述。第二部分讨论有关用于评估Windows网站性能的WCAT和WAST工具的特定详细信息。还提供了一个案例研究,详细介绍了这些工具的使用以及一些有趣的性能发现,这些发现可能适用于您的环境。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号