首页> 外文会议>CIRED Workshop 2016 >Optimising virtual power plant response to grid service requests at Newcastle Science Central by coordinating multiple flexible assets
【24h】

Optimising virtual power plant response to grid service requests at Newcastle Science Central by coordinating multiple flexible assets

机译:通过协调多个灵活资产来优化虚拟电厂对纽卡斯尔科学中心的网格服务请求的响应

获取原文
获取原文并翻译 | 示例

摘要

Newcastle Science Central is introduced; a 24 acre city centre site being developed as an exemplar sustainable urban environment encompassing Smart Grid technologies throughout. A real time energy management algorithm is proposed to maximise the power availability of the site's flexible electrical assets; all of which have different operating characteristics. Each asset is considered in an equivalent form similar to energy storage, allowing it to be compared on a like-for-like basis through a virtual state of charge. The new Enhanced Frequency Response service offered by National Grid is used as a case study to demonstrate that through intelligent energy management, the site operated as a virtual power plant, can deliver greater value than the sum of the constituent assets operating individually to the same overall control signal.
机译:介绍了纽卡斯尔科学中心;一个24英亩的城市中心站点正在开发,作为示例性的可持续城市环境,涵盖了整个智能电网技术。提出了一种实时能源管理算法,以最大程度地提高站点的灵活电力资产的电力可用性。所有这些都有不同的操作特性。每种资产都以与能量存储类似的等效形式被考虑,从而可以通过虚拟充电状态在相似基础上进行比较。国家电网公司提供的新的增强型频率响应服务被用作案例研究,以证明通过智能能源管理,作为虚拟电厂运行的站点可以提供比单独运行的组成资产总和更大的价值。控制信号。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号