首页> 外文会议>Cigre session >DETERMINATION OF THE ACTUAL PQ DIAGRAM OF THEHYDROGENERATORS, BEING IN SERVICE, IN ORDER TOESTABLISH THEIR MAXIMUM OPERATING DOMAINS ANDTHEIR CAPACITY TO PROVIDE SYSTEM SERVICES
【24h】

DETERMINATION OF THE ACTUAL PQ DIAGRAM OF THEHYDROGENERATORS, BEING IN SERVICE, IN ORDER TOESTABLISH THEIR MAXIMUM OPERATING DOMAINS ANDTHEIR CAPACITY TO PROVIDE SYSTEM SERVICES

机译:确定正在使用的水轮发电机的实际PQ图,以确保其最大运行域及其提供系统服务的能力

获取原文

摘要

The theoretical PQ diagram represents the diagram of the reactive power versus the active power of a hydrogenerator, deduced from the phasorial diagram of the synchronous machine with salient poles. The actual PQ diagram is in fact a thermal diagram, in which the main theoretical curves represent the isotherms of the maximum admissible temperatures of the different parts of the electrical generator. Determination of the actual PQ diagram of the hydrogenerators being in service is performed in steady state operation, by measuring the maximum overheating appearing in the stator and rotor windings, in the stator core and in the frontal teeth sheets of the stator core. On the actual diagram, the secondary band is delimitated, where the produced or absorbed reactive power is paid, because the operation in this region is done with higher strains and costs. Measurements were performed on 25 hydrogenerators, with powers between 27-170 MW.
机译:理论上的PQ图表示水轮发电机的无功功率与有功功率的关系图,该图是从带有凸极的同步电机的相线图推导出的。实际的PQ图实际上是一个热图,其中的主要理论曲线表示发电机不同部分的最大允许温度的等温线。通过测量在定子和转子绕组,定子铁心和定子铁心的前齿板中出现的最大过热,可以确定稳态运行中水轮发电机的实际PQ图。在实际图表上,划定了次级频带,在其中支付了产生的或吸收的无功功率,因为​​在该区域中的操作需要较高的应变和成本。测量是在25台水轮发电机上进行的,功率在27-170 MW之间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号